Diploma From Tamilnadu Polytechnic college, Madurai, in 2010 With 62%
Key Skills:
Leadership Qualities
Time Management
Self-control, Open-minded/flexible & level – headed
Initiative & problem solving skills
Ability to conceptualize ideas
Resourcefulness & the ability to troubleshoot
It Skills
Proficiency in MS Office, Word, Power Point, Excel , SAP R3.
Engineer - Production
Since Mar 2015
Company Profile: Manufacturer of plastics molded components for 2 wheelers and 4 wheelers
Junior Engineer – Production (shift Incharge)
Jan-2011 TO Mar-2015
Company Profile: Manufactures air, oil, fuel and hydraulic filters which are used in the automotive, railways & aviation industries.
Operating engineer Trainee - Production
Jan-2010 To Dec-2010
Company Name: Krishna Rubber Industries
Roles & Responsibelity:
Morning meeting & Man power allocation.
Production plan & Material requirement planning shift wise.
Hourly production monitoring.
Production variance analysis
In house rejection analysis.
Daily QRQC review.
Machine trouble shooting.
Mold /Fixture change over.
First piece approval.
Machine down time analysis monthly with HOD.
Rejection analysis monthly with HOD.
Kaizen improvement activity.
OE training and evaluation.
Improvement activity.
Work instruction preparation.
Production report update in SAP.
Daily check sheet verification.
5S activities and initiatives.
OE skill matrix up gradation and OE growth files update.
Working Experience In Team:
Handling Sixty People Operating Engineers and Three Mold setters in Injection Molding and Assembly lines.
Machines & Molds:
Toshiba, Ferromatic , Engel, L&T, Demag (handling
100 TON & 2500 TON)
Two platemould ,Three plate mould(seq valve gate, hydraulic core ,hot runner tool)
Robot gripper design & program setting
Handing starsekei, wittmann
Materials:
PP,ABS,PC,PS,,PMMA,Nylon PA-6 GF 30%,PA-66 GF 35%
Auxilary Equipments :
Robot ,chiller ,mould temperature controller, hot runner controller,hydraulicpowerbacks,Granulator ,coveyorand dehumidifier
(starsekei, wittmann, gwk Prasad)
Special Training Under Gone:
Project development training in Singapore(Sunningdale precision industries ltd)
Process setting & troubleshooting in Injection Molding given By Japan Team.
Robot program setting & Robot gripper training
Tool room maintenan
Achievements:
In house design and development robot gripper for
(Volvo,Nissan.simpson,volkswagen,Honda)
Audit handling and all documentation for the Major OEMS like Renault Nissan,honda,volvo.
Implementation of quality improvement tools such as 7QC, Poka-Yoke
Man Power Reduction in Assembly lines
Single piece flow in the Assembly process.
Best Team Award for 2013 injection molding process setting & New product Trail
Growth
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com