plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 10:05:35 AM ________________________________________________________________________________________ RefNo: CA - 12026 Gender: Male Age: 62 Designation: Manager Highest Education Level: Masters - Degree Current Gross Salary: 1200000 1200000 /Annum Expected Gross Salary: 1700000 1700000 /Annum Notice Period: 30 Days Education Details: MBA from IASE Deemed University near the town of Sardarshar in India?s North-western state of Rajasthan, India. B.Tech in Electrical Engineering from IASE Deemed University near the town of Sardarshar in India?s north-western state of Rajasthan, India. Diploma in Electrical engineering from Dayal Bagh University Agra, India. HSC (Science) from Board of Uttar Pradesh, India. Skill Sets: An Electrical Engineer adapt at usage of computer application with 25 Years of experience in the area of Project planning, Erection & Commissioning and through experience in the Field of Preventive, Predictive & Breakdown maintenance of plastic injection molding plant. Production planning, quality system inspection & monitoring of the following plastic/ Electrical / Instrumentation control system concerned with the below mentioned. Work Experience: 36.5 Work Experience Details: Manager Service Since Aug 2012 Company Profile: The leading injection molding machine manufacturers, importing & exporting traders as well as various professional research institutes. Responsibilities: Erection, commissioning and maintenance, training and trouble shooting of plc controlled plastic injection molding m/cs ( 60 t to 2400 t). Manager Service April 2012 to Aug 2012 Company Profile: anufacturer of plastics machinery, injection molding machines etc. Responsibilities: Erection, commissioning, operation and maintenance of plc controlled and servo system pump (VFD) plastic injection molding m/cs (60 t to 2400 t). Installed and commissioned m/cs for customers: Krishna Maruti ( 2400 t), Nobel Noida & Haridwar ( 1800 t), Vimal Gr. Noida & Manesar ( 1400t), DLJM Noida and Gr. Noida, Kustocom Noida, Supreme Khuskhera & Pune. Manager Sales and Service (supporting sales from out side) Nov. 2003 - May 2010 FCS ( Fu Chun Shin) Machinery Manufacture Co. Ltd. Responsibilities: Erection, commissioning and maintenance of plc controlled plastic injection molding m/cs ( 60 t to 2400 t) Manager maintenance Feb. 2003 to Sep. 2003 Motherson Automotive Technologies and engineering ( MATE), Noida Responsibilities: Plant Maintenance including injection and blow molding m/cs. electrics & automation consisting of ABB/ Simence PLC controlled variable AC/DC drives, Erection, Commissioning and maintenance of HT & LT substation equipments, Compressors, A.C. /D.C. Drives, EOT cranes, D. G. Sets etc. Manager Operation Sept 1998 to June 2002 Toshi Auto Industries Ltd. Faridabad & Manesar Responsibilities: Plant Maintenance including injection and blow molding m/cs. electrics & automation consisting of ABB/ Simence PLC controlled variable AC/DC drives, Erection, Commissioning, Operation and maintenance Of HT & LT substation equipments, Compressors, A.C. /D.C. Drives, EOT cranes, D. G. Sets etc. Self Employment Sep 1990 to Aug 1998 Responsibilities:Erection, commissioning, operation and maintenance of and plc controlled injection molding machines and other PLC based m/cs Service Engineer Feb. 1987 - Oct. 1990 Klockner Windsor India Limited, New Delhi Responsibilities: Erection, Commissioning, operation and maintenance of plastic Injection molding machines. Job Profile: To set up and complete the plastic injection molding plant project( selection of m/cs, plant layout, construction of building, laying, erection, commissioning of m/cs and equipments, costing of products, run the plant and hand over to production deptt) Departmental manpower management & monitoring their responsibilities, also to encourage & guide the employees to perform as a team. Co-ordination with the maintenance & Production departments. Existing system?s Preventive, Predictive & breakdown maintenance to reduce the system down time. Spare parts inventory management. Safety aspects of the existing system as well as for man power too. To lead the energy management cell for the optimization of the energy consumption. Preparation of Budget, Work schedule, Estimates, work order & ISO documentation etc. Planning, indenting and procurement of spares Production planning ( machine loading days, raw material, man power etc) Future Goals: To serve diligently & sincerely as a Key Engineering person ensuring sovereignty, reliability & stability of the system. ________________________________________________________________________________________