plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 3:12:32 AM ________________________________________________________________________________________ RefNo: CA - 15330 Gender: Male Age: 38 Designation: Manager Highest Education Level: Graduate - Degree Current Gross Salary: 700000 700000 /Annum Expected Gross Salary: 700000 700000 /Annum Notice Period: 15 Days Education Details: B.Tech. (Mechanical Engineering) from Sreenidhi Institute of Science and Technology, Hyderabad, JNTU in 2009 with 64% XII from Sri Chaitanya, Hyderabad, Board of Intermediate Education, A.P. in 2004 with 89% X from Divyanjali High School, Hyderabad, SSC Board in 2002 with 80% Skill Sets: Design Engineering, Client Relationship Management, Maintenance Operation, Research & Development & New Product development Work Experience: 14.8 Work Experience Details: Assistant Manager Since Dec 2014 Company Profile: Manufacturer of high-tech test systems for environmental simulation, cost-effective test systems up to customised walk-in chambers and in-line-system Job Profile: For Designing Projects: Responsible for designing Air Conditioning/Air Con Ducts, Compressors, Condensers as per Project Requirement Calculation of Heat Load [HVAC] ,Compressor, Pump etc selection for Project Environmental Chambers For Projects: Erection and Commissioning of Walk in Test Chambers for Major Automobile Companies. Supervising Day to Day Activities & Project Planning (P6, MS Projects) Complete Project Management Localization of Products: Project Clima Reduced the price of Couple of Products by 50%. Integrating with local suppliers in India without compromising the German Quality. Activity carried For A Market Potential of 8 Million Euros / 600 Million INR For Sales / Project Sales: Responsible for Customer Development, Vendor Development, Project Development, Sale, Price Assessment/Cost Reduction, Quality Analysis Design Consultant Oct 2014 - Dec 2014 Company Profile: Manufacturer of Centrifugal dewatering pumps, slurry pumps, Piston diaphragm pumps, hose diaphragm pumps, Comminution equipment,Mill Lining Systems,Rubber Hoses and spools, valves, etc Job Profile: Responsible for designing: Designing-Concept to Approval Crusher Structure, Chutes, Structural Gratings, Assemblies as per Australian Standards and customer requirement/technical specifications, material grades (HDPE, Steel etc) Piping Engineer Oct 2012 - Apr 2014 Company Name: Thermo Systems Private Limited Job Profile: Responsible for designing: Fuel Oil Handling System (Fuel Oil Storage Tanks, piping, pumps, motors, steam traps, Strainers, etc.) as per customer requirement in tender/ tech. spec. of enquiry according to standard codes IS 803, API 650, etc. Heat Exchangers and Floor Coil Heaters as per customer requirement Pipe Routing, Piping Layout Involved in making master document list, schedules, datasheets of instruments, valves, pumps, motors, etc. Performed detailed calculation of tanks and static equipment Handled pipe sizing, thickness calculations, pipe specifications, NPSH calculations, pressure drop calculations, etc. Accountable for: Creating P&IDs, GADs, layouts, plans, modification of drawings after comments/ resubmission Preparing BOQs, BOMs and Material BOQs, Paint BOQs, etc. Followed up purchasers for site commissioning Effectively used the following standards for material selection and designing: API 650, API 598, API 600, API 602, IS 803, IS 1367, etc. ASME B 31.3, B 36.10, B 36.19, B 16.20, B 16.21, B 16.5, B 16.47, B 16.9, B 16.28, etc. ASTM A36M, ASTM A216, A106, A312, A182, SA105, SA 193, etc. Handled documentation related to project, all necessary correspondence, manually and through ERP until approval of the drawings and communicated to production department Highlight: Effectively worked on FOHS Projects worth more than Rs. 15 Crores and successfully saved approximately 10% of money in design Plant Engineer Feb 2011- Oct 2012 Company Name: HSIL Limited (Hind Ware) Job Profile: CAPEX Projects: Responsible for developing over 150 drawings of various plant equipment, utilities, etc. and led a team for executing project Involved in project planning, project schedule making, preparing gang sheets & PERT charts, executing project, performing quality check and handling contractor RA bills Effectively designed plant equipment & utilities, Piping by using Solid Works & AutoCAD i.e. Assembly Designs, Design of Gravity Tanks, Slip Tanks, Glaze Tanks, Their Shafts & Couplings, etc., Slip Line, Compressed Air Line, Oil-Seals, Hydraulic Cylinders, Blunger (Its shafts, couplings and components like pulleys, housing, bushes & covers), Various modifications of equipment, work benches of batteries and sheet metal design Pipe routing and piping layout For Maintenance: Monitored maintenance of plant, ISO requirements of department, preventive maintenance activities and effectively managed workmen for routine maintenance, breakdown maintenance, etc. Prepared daily progress reports of the work executed, created new reports, looked after the efficiencies, etc. using SAP Accountable for coordinating: Audits (ISO & IMEA), department requirements for audit, practiced 5S, problem analysis by making PARETO charts, ABC Analysis, Kaizen, Fish Bone Diagrams, etc. Purchase requirement of project and other internal requirements in SAP Highlights: Efficiently & effectively utilized space and saved 100X100 sq. m Steered efforts in innovating planned and preventive maintenance Successfully improved Sigma level by 1.6 Played a vital role in saving project capital Received Safety Award for 2012 Steered efforts in bringing 4 Benelave products to the market and effectively designed BENELAVE Wash Basins, EWC, I WC, Pedestals, etc. by using Solid Works & NPD Terminology Junior Engineer May 2009 - Feb 2011 Company Name: Micro Enterprise Job Profile: Key Result Areas: Executed 33.3 MW, CPSU Project for VPSPL for GNVFC Responsible for scheduling project, erecting boiler & HRSG-chimney erection, gas turbine support structure erection, crane selection based on load chart, RA bills, price variation bills and handling bills claiming Involved in designing mechanical aids Technical Skills Well versed with: PDMS, AutoCAD, Draftsight, Solid Works, ANSYS, E-Tank, ERP and SAP MS Office (Word, Excel & PowerPoint) and Internet Applications New Product Development/ NPD, Design, GD&T, BOQ, BOM, Drawing Verification/ Drawing Reading Expertise, Reverse Engineering, Conceptual Design and ASME Y14.5 All piping standards Certification: Green Belt in Six Sigma from Indian Statistical Institute (ISI) in 2014 Other Skill: Possess vocabulary of 8180 words Academic Projects Title: Optimal Design of Oil Cooler (Live Project) Dec 2008 - Apr 2009 Company Name: BHEL, Hyderabad (Patancheru, Rcpuram) Scope: Designing & comparing various heat exchangers considering the best design which gives less pressure drops and a low overdesign. According to the flow patterns the tube profile is selected and layout is drawn using AutoCAD. Doing sizing of heat exchanger and founding dimensions for manufacturing. Title: Design of Steam Surface Condenser Jun?08-Jun?08 Company Name: BHEL, Hyderabad (Patancheru, Rcpuram) Scope: Studying various parameters affecting the efficiency of surface condenser and finding the causes for inefficiency by comparing the design in two methods (NTU, LMTD). Designing of surface condenser is done bases on optimum design. Summer Internship Title: Functional Aspects of Special Purpose Machines (SPM?S) & PPC (Production Planning & Control) May?07 - May?07 & Oct?07 - Oct?08 Company Name: HMT Scope: Processing of various machineries combined with design aspects and CNC programming. Extracurricular Activities / Other Accolades Participated in various competitions at district level in Taekwondo Holds the distinction of securing: 93.39% in Common Admission Test (CAT-2008) with 99.36 in Maths 800/ 800 in GRE Maths and 500/ 800 in GRE English 96% in Eng. & 98.16% in Maths in NMAT 95.6% in 11th Standard College Topper 93% in Engineering Project Merit of being selected for: Narsi Monji, Mumbai SIOM, NICMAR National Level Competitions: National Su do Ku Competition conducted by Times of India in 2008 and Young Manager Competition by IMS in 2008 Successfully completed 1st Semester of GNIIT Summary Six Sigma (Green Belt Certified) professional with 5.5 years of experience in Design Engineering, Maintenance Operations, Documentation and Client Relationship Management Adept at managing Design Engineering Operations involving design & development, developing detailed drawing for transmission production, co-ordination with internal departments Expertise in coordinating project erection & commissioning Adept in handling the entire scope of Product Engineering Operations right from design & development, coordination with internal departments, process development, interfacing with vendors, till smooth transfer from development to production Expertise in managing systematic maintenance/ predictive maintenance and failure analysis for reducing breakdown/ downtime & enhancing operational effectiveness of equipment finishing machines & testing machines Deft in planning & implementing the preventive, predictive and breakdown maintenance schedules for improving overall reliability and safety of plant equipment & machinery Well versed with the concepts of Power Plant Engineering, Heat Exchangers, Strength of Materials, Design, Refrigeration & Air-conditioning Possess excellent relationship management skills and strong analytical, decision making, problem solving & organizational abilities Core Competencies Analyzing and producing the technical requirements and specifications & recommending design modifications based on client requirements Coordinating product development/ customization functions including requirement analysis, finalizing specifications, designing, prototype development and testing activities Developing project baselines, controlling projects with respect to cost, resource deployment, time over-runs and quality compliance to ensure satisfactory execution of projects Conducting site visits for project information, submission of drawings, BOM/ BOQ calculations, negotiations with suppliers/ contractors as per client/ project requirements Increasing machine up time & equipment reliability by implementing maintenance schedules and carrying out periodic checks; maintaining requisite documents Planning and effecting predictive & preventive maintenance schedules for various machineries and equipment to increase machine up time & equipment reliability Identifying areas of obstruction/ breakdowns and taking steps to rectify the equipment through application of troubleshooting tools Future Goals: Scaling new heights of success with hard work & dedication and leaving a mark of excellence on each step, aiming for challenging assignments in Piping Design/ Project Engineering with a reputed organization, preferably in Oil & Gas/ Manufacturing sector ________________________________________________________________________________________