plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 2:10:28 AM ________________________________________________________________________________________ RefNo: CA - 15924 Gender: Male Age: 37 Designation: Executive Highest Education Level: Graduate - Degree Current Gross Salary: 350000 350000 /Annum Expected Gross Salary: 400000 400000 /Annum Preferred Location: North India Notice Period: 30 Days Education Details: B.Tech in Electrical Engineering in 2009 With 69.9% H.S.C From?D.A.V.P.G. College Daulatpur Chowk, Teh. Amb, Distt. Una, Himachal Pardesh ?in 2005 With 60% S.S.C From?Gov. High school Niar, Teh. Jaswan Kotla, Distt. Kangra, Himachal Pardesh in 2003 With 77.5% Skill Sets: Microsoft Office Suite SAP- Basic knowledge of SAP. Raising Purchase requisition through SAP, Daily overview of critical stock items, Daily and Weekly plan for Preventive maintenance and Record of Breakdown maintenance? Work Experience: 14.5 Work Experience Details: Executive - Maintenance Since Aug 2013 Company Profile: Is one of the leading foundries in India, in the segment of Automotive Castings. The foundry specializes in the manufacture of Cylinder Heads, Cylinder Blocks and Housings. In domestic market DCM is associated with top automotive players: Job Profile: Looking after the preventive maintenance, autonomous maintenance, breakdown maintenance of shot blasting machines, Maus machines, Lathe machines & conventional machines, Hydraulic & pneumatic Equipments & Air Dryers. Erection & commissioning work of Shot blasting DISA machine, Main distribution Board, Sub-distribution board Deft in on-site erection & commissioning of machines, updation from relay logic to PLC & HMI & PLC control panel designing, field wiring for ensuring maximum efficiency of machines to maximize the output Responsible for predictive & preventive maintenance of shot blasting machines, SPM, CNC , PLC & Conventional Machines ?of CWS & Fettling shop Reducing MTTR, Increasing MTBF & Productivity and reducing cost by generating Kaizen, Sankalp, Quality circle- a platform enabling implementation of process improvement idea given across workforce Maintaining 5?s i.e., tool used for standardization Detailed analysis of critical breakdowns Analysis & removal of Red tags & unsafe conditions & acts.? To Assist Facilities, Quality and Manufacturing Engineering on problem identification, trouble shooting and equipment issue resolution and repair. Entry of Purchase Requisition, Stock Overview, Material issue recquition through SAP. Finding out the appropriate solution for the problem utilizing TQM concept of Problem Solving Process with PDCA cycle. Highlights: Successfully implemented project as to make it stable & predictable by using Total Quality Management tools? Description: - Detailed analysis of past & current data through TQM tools. Implementation of Kaizen, Sankalps, Quality circle, Problem Solving Process (PSP), 5s and 3M. Effectively reduced the repairing cost of C.P. Chain hoist by ?50%, reduce the MTTR of S.B. Machines by 30% & Increased the MTBF of Machines of shot blasting machines by 44% Description: - Repairing cost of C.P. Chain hoist reduce by quality circle, Mean Time to Repair (MTTR) was reduced by adding electric signal announciator in all panels, making standards & proper management of required tools. Mean Time between Failure (MTBF) was increased by developing Gamba, Kaizen, Why-Why analysis & removed the problem from its Root Cause by doing Root Cause analysis. After implementation CLIT machine handed over to operator. Reduce the cycle time of shot blasting machine (Vulcan Laval) by 45 seconds by rewiring the panel for auto operation. Description: - ?Cycle time reduce by in-house made auto opeartion panel. Qualified to Step-3 of Autonomous Maintenance of Indabrator machine, BMD machine, Maus machine, Mecshot machine in year 2014-15 Description: - Identified white tags and red tags after their Why-Why analysis all the tags were removed by implementing Kaizens and One Point lessons (OPL?s) Increase the MTBF of shot blasting machine?s bucket elevator by providing rotation control system. . Description: - Bucket elevator belt of shot blasting machine broken when its buckets entangled with the elevator?s body. Provide rotation control system at tail pulley area of elevator so that when belt (ail pulley) will not rotate and will stop at one place the rotation control system will off the control power. Replace LT side & HT side bushes, tap changer handle, explosive band gasket , HT & LT side terminal plate gaskets, head gasket of 1000 kva transformer.? Description: - Leakage from LT side bushes, tap changer, so change the all gaskets of transformer,connection trminal.Done de-hydration/filtration of oil . ?Tightening of all tap changing unit connection . Troubleshooting of ?motor starters, relay logic, PLC Machines (SIEMENS S7-200 & S-7 300) by software & visualizing Electrical Circuit Drawings. Troubleshooting of Hydraulic & pneumatics breakdowns Troubleshooting of Electrical breakdowns. Maintenance Executive Engineer June 2010 to Jul 2013 Company Profile: Designs, manufactures, and sells air conditioners in India.? Job Profile: Planning and effectuating predictive & maintenance schedules for plant machinery , utility equipments to increase machine up time & equipment reliability. Planning & Maintaining ?the D.G. Set & air compressors services material Responsible for breakdown maintenace of Window line ODU & IDU line, Intech Paint shop, Molding machines, Core shop machines, Fan balancing machines. VBHB Machine Machine spares planning for better machine availability. Highlights: Effectively operated the Control sub-station, steam boiler, cooling towers, DG set synchronization system, low & high ?pressure air compressors & Driers. Internships: Three ?phase & single phase ?induction motor overhauling, motor starters ?& cable selection JCT Ltd. Phagwara 20 Jun 2011 to 20 July 2011 Understood the overhauling schedule & SOP for three phase and single phase indution motor overhauling, motor starters & power cable selection? Electrical Power generation Hydro Power Project Bassi, Distt. Mandi, Himachal Pardesh 15 Jun 2012 to 3 July 2012 Understood the Electric Power generation & distribution system Trainings provided by DCM DCM Engineering Products Attended training on Quality Circle, Autonomous Maintenance, Basics of Hydraulics, Basics of Pneumatics, Shop floor leadership, Fire & Safety, Basics of PLC, I & WE, 5-S. Future Goals: .......... ________________________________________________________________________________________