plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 5:27:04 AM ________________________________________________________________________________________ RefNo: CA - 1761 Gender: Male Age: 45 Designation: Senior Executive Highest Education Level: Post Graduate Diploma Current Gross Salary: 170000 170000 /Annum Expected Gross Salary: 250000 250000 /Annum Preferred Location: Anywhere in India Notice Period: 30 Days Education Details: Graduation (10+2+3) from Smastipur College. L.N.M.U CHEM (H), PHY, MATH in 2003 PGD-PPT HAJIPUR from CIPET in 2005 PLASTICS PROCESSING, PLASTICS TESTING, MOLD DESIGN, S.Q.C, O.M, COSTING, M/C MAINTAINENCE IST SEM=72 2ND SEM=76 3RD SEM=83 Skill Sets: Production Planning Work Experience: 19.7 Work Experience Details: Senior Shift Engineer - Planning Engineer Since July-07. Job Responsibility:- Production Planning Getting demand from marketing department in regular basis Making a Planning sheet for those requirement in order to get smooth dispatch in stipulated period with lowest possible cost ( cost criterion given by management) Reviewing Assignments of manpower for Particular hob up to packing I.S.O Documentation Reviewing, maintaining &upgrading the files required for I.S.O Internal and External audits (For Production) Process setting Trouble Shooting for getting optimum quality Product within given resources Production Shift Engineer Prince Pipes & Fitting Pvt. Ltd Dec 06-July 07 Job Responsibility:- Process Monitoring Making a Process data sheet for Standard parameter for standard Cycle time & optimum quality Ensure that the standard Parameter is running Achieving Resemblance Ensure Produce Product having all basic requirement of sample Technical Achievements:- Project 1: Process Standardization Period: Jan 07-Apr 07 No. of Persons in team: Six Position: Team Leader Responsibility With the Support of All team mates calculation of tentative parameter of all injection molded Articles provide by the company in market Project Success 85% ( 15% failure due to creation of gap in screw & barrel & Thermocouple Mounting Problem) Project 2: Enhancing Machine Effienciency Period: May 07-Sep 07 No. of Persons in team: Five Position: Member Responsibility Calculation of Changing of diameter of Screw (L:D ratio) and measure of Effects (Practically & Theoretically) Project Success 100% Shift Engineeer. Cello Pvt. Ltd. Duration: 8/02/05-30/11/06 Job Responsibility Production shift handling Trouble shooting Mould Maintaince Machine Electrical & Hydraulic Maintaince Handling of Manpower with hop of supervisor Future Goals: I want to see myself as a Technically Sound Production Manager. ________________________________________________________________________________________