plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 6:25:59 AM ________________________________________________________________________________________ RefNo: CA - 18458 Gender: Male Age: 35 Designation: Engineer Highest Education Level: Graduate - Degree Notice Period: 30 Days Education Details: B. E (MECH) From PET Engg., college Vallioor, Anna University in 2012 With 73% First Class H. S. C From Concordia Hr. Sec. School, Vadakangulam, State Board in 2008 With 81% S.S.L.C From Concordia Hr. Sec. School, Vadakangulam, State Board in 2006 With 88%? Skill Sets: STRENGTH High Tonnage machine process setting and mold setup Good knowledge in water treatments Handling properly high precision mold/ Hot runner molds with multi core operation Worked with wide variety of materials Handling of PLC controlled injection molding machine from 50 tons to 900 tons Having leadership Qualifier capable of motivating my team and leading them from the front in achieving the target Knowledge of tools of data analysis like QC tools Set up the de humidifier dryers ,heaters and production equipment?s Plant startup and shunt down procedure Effective handling of Machine and molds troubles shooting repairs Software?s known MS OFFICE, SOLID EDGE, FEMAP, BASICS OF ANSYS. Work Experience: 13.2 Work Experience Details: Shift Engineer Since May 2015 Company Profile:?Manufacturer of Injection & Blow molding of PET Preforms and bottles Shift Engineer Oct 2013 To May 2015 Company Profile:??Manufacturer of precision engineering plastic components, plastic?Bucket, plastic tub, pet preforms (from 300 ml up to 5000 ml), & Pet caps Customers : Whirlpool, Godrej, Jyothy lab, Kiwi care, PET India Shift In Charge Jun 2012 To Sep 2013 Company Name: Abirami PET Industries, Company Profile: Injection molding & Blow Molding of 20 Littre, 10 Littre, 5 Littre, 300 Ml, 500 Ml, 1000 Ml, 2000 Ml Pet preforms, CSD, HOT FILL Preforms, Pet caps, Pet jars Job Profile: Production planning, Raw material planning and control Effective handling of Dehumidifiers and Chillers Reviewing with unit head the production status daily / weekly / monthly basis Handling customer complaints with proper analysis and worker Reducing in process rejection by doing proper analysis Process standardization, Trouble shooting in new mold trails Implementation of all the process parameters required for maintaining quality of the products Maintaining all record Maintain 3C &5S on shop floor Major Achievements Reduced the percentage of scrap in production operation AS a member of mold change time reduction ?team we achieved the target Reduced rejection and runner wastages Optimizing the manpower? Achieved the raw material usages ex: RP & RG to maximum level Implementation &modify the pet injection molds Materials Handled: PET, ABS, PPCP, PPHP, HDPE,LDPE,HIPS,HDP,LDP, LLDP, SAN, TAG FILL, PMMA, NYLON, POM Machine Handled:FEROMATIC MILICRON, JOHNWAI (Two stage Injection) WINDSOR, TOSHIBA and L & T, LG, JSW, ARBURG, DEMAG, CINCINNATI MILACRON, SUMITOMO. Molds Handling ?of ?all types ?of mould with multi core operation, hot runner and multi cavities Repair & maintenance of of all types of mould like air injection molds, valve gate system moulds, HR Pin system moulds? Future Goals: To pursue a highly challenging carrier, where I can apply my knowledge and acquire new skills and contribute constructively to the organization. ________________________________________________________________________________________