plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 9:15:36 AM ________________________________________________________________________________________ RefNo: CA - 20453 Gender: Male Age: 44 Designation: PLANT MANAGER Highest Education Level: Post Graduate Diploma Notice Period: 30 Days Education Details: Post Graduate Diploma in Plastics Processing & Testing from (CIPET)Central Institute Of Plastics Engineering and Technology, Bhubaneswar B.Sc From?Utkal University, in 2001 H.S.C From?C.H.S.E in 1998 S.S.C From?B.S.E in 1996 Skill Sets: MATERIALS HANDLED; PPCP, PPHP, HDPE, SAN , PC, ABS,PS,RUBBER,DELRIN,UPVC ,PET, COMPUTER SKILL: P.G.D.C.A. from Indian Institute of Industrial Technology, in 2001 Work Experience: 24.1 Work Experience Details: PLANT MANAGER From JULY 2016 to till date Company profile- Manufacturer of paint lead, plastic paint containers & narrow mouth containers. Job profile- Overall Plant Operation. Contractor and manpower Arrangement. Team Building as soon as Employee Requirement, Customer Relation with Planning. Green channel Development. BLUE PRINT Implementations. PACON SCORE IMPROVEMENT from customer. WORK UPDATION of Stores, Accounts, Planning, QA, Administrative, Assistant Manager (Production) Since Jul 2012 to JULY 2016 Company Profile: Asian Paints Container & Lid Job Profile: Production and Planning Mould Maintenance. Machine Maintenance. MIS Report prepare Raw Material Reconciliation. Improvement of production Process. Preparation and implementation of RCA-CAPA. Preparation of monthly rejection analysis. Optimum Utilization of Manpower to meet the targets. Meeting Machine-wise, Article-wise and Performance Targets. Ensuring Quality in Production Initiate Corrective Actions to Solve Quality Problems in Production, If Necessary to Solve Quality Problems and maintain minimum lumps formation. Responsible for new mould trials and new products trials To maintain just in time process to the costumer end. To maintain 5S & safety) in the shop floor area. Minimizing The Possibility Of Machine Break Down,. Responsible for daily production planning of molded part on Injection molding machines. Planning daily production and manpower. Responsible to increase the production output in the factory in the term of quality and as well as quantity. To achieve Production targets by optimum utilization of resources like men, machine, material, etc. To set and maintain optimum process parameters and fine tune the process to ensure productivity. To trouble shoot any process related problem, ensure molding quality and Establish corrective action to control non-conformities. To take trials and establish process for the new mould and new materials. Train to all workers about safety, Housekeeping and motivate to get the maximum output from individuals. Machines Handled: Omega 80 ton to 650 tonnage L&T de tech 60 ton to 550 tonnage Magna 660 tonnage Windsor-250 ton to 450 tonnage ASWA-550 tonnage Hydron-100 Tonnage to 450 Tonnage Materials Handled; Ppcp, Pphp, Hdpe, San , Pc, Abs,ps,rubber,delrin,upvc ,Pet, Production executive Mar 2010 - June 2012 Company Name: Hitech Plast (Ltd Company Profile: Asian Paints Container & Lid (Buckets) Job Profile: Production Engineer Aug 2009 ? Jan 2010 Company Name: Mopani International (Moz.) Ltd Company Profile: Company Name : PRINCE Pipes & Fittings Pvt. Ltd, Silvassa,( Gujurat) Manufacture of : PVC Pipe Fittings Designation : Shift Engineer Duration : 1.7 yrs (Jan 2008 ? July 2009) Production Engineer Aug 2005 ? July 2008 Company Name: Cello, Daman, ________________________________________________________________________________________