plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 2:08:56 AM ________________________________________________________________________________________ RefNo: CA - 22737 Gender: Male Age: 41 Designation: Senior Executive Highest Education Level: Graduate - Degree Notice Period: 30 Days Education Details: B.Tech. (Electrical Engineering) From Kamla Nehru Institute of Technology, Sultanpur UP (Government College) in 2008 with 71% H.S.C. From?St. Anthony Senior Secondary School, FatehgarhFarrukhabad UP with 78.20% S.S.C From?St. Anthony Senior Secondary School, FatehgarhFarrukhabad UP with 79.80% Skill Sets: ? An efficient key player in challenging & creative environments with excellent capacity to adapt to new technologies and skills. ? Quick learner & self-directed; consistent updating self with the emerging trends in the Industry. Work Experience: 16.5 Work Experience Details: Senior Executive - Erection/Commissioning/Maintenance Since Jan 2011 Company Profile: Leading manufacturer of petrochemicals Job Profile: Involved in pre-commissioning and commissioning of the Polymer Plantand associated Petrochemical Plant. Working in the GIS system (Gas insulated Switchgear) at 66KV system. Total no. Of Substations 21 and one 220KV Switchyard. Involved in the pre-commissioning of 12100 KW ExtruderMotor,1850 KW Gear Motor,490 KW Cutter Motor Ansaldo make VFD drives. Involved in operation/maintenance of 3200MT per day capacity Urea Plant. Involved in day to day maintenance activities of electrical equipment?s and spare management in Urea Plant. During 30 days Shutdown Ansaldo make Generator (24250 KVA) O/H and testing done. Worked in 415 V Amtech make VFD of 315 KW,15KW drives and Siemens make(Micro master 440Series) VFD of various ratings. During Shutdown Generator Cable being replaced with the new one (400 sq.mm 11KV Copper Cable Make-Polycab)(new vendor developed Raychem in-place of Birla 3M regarding kits) 168 Tonne Cooling System and 33000 CFM AHU being commissioned for the Cooling of 23MW Generator(new vendor developed and also AMC being given for the previous installed cooling system) Lighting Arrester and Potential Transformer being replaced in 132KV Switchyard to enhance the reliability. Also 132 KV MOCB Make Bhel O/H done. 2.5 MVA Emergency Diesel Generator(EDG) maintenance and schedule operation is done. Thermo-graphy,CSA,DIAGONSTIC testing of the HT panels and motor being done. 40 days shutdown after 2 years being taken in which 2 Transformers (2MVA) erection, commissioning, testing being done for the new project. Shutdown planning, vendor selection discussion scope of work and execution being done. During Shutdown Maintenance of two 3.3kv Switchgear, 6 no. of Transformers, 4PCCs and 6 MCCs being done. Worked in the numerical relays of Siemens/ABB/SEL/Schneider. For the new project (ESS) about 20 new motors (from 3.7kw to 125kw) commissioning done during shutdown. Lift main, governor, sheave rope and limit switches being changed during annual shutdown. Following the activities involved in 5S. WCM practices are followed. Involved in commissioning of 4500 TPD Kiln cement plant (kruppPolysius-TKIL) at Dalla Cement Factory. Involved in commissioning of HT Motors of Raw Mill Drive 3600KW, Raw Mill Fan 3600 KW,Preheater Fan and Bag House Fan each of 3300KW. Involved in commissioning of Material Transport Circuit. Involved in commissioning of Cement Mill at Chunar Cement Factory. Involved in commissioning of 132 kv Switchyard at Chunar Cement Factory. 132 kv switchyard with 50/25/20 MVA Transformers. 132 kv Sf6 Breakers, 11kv& 6.6kv Vcb Breakers and HT panels. Involved in commissioning of Mcc,Pcc and LT Drives. Integrated Load Management System Panel commissioned. Worked in Relays of Micom P-341, P-111, P-632, P-120, and P-921. Worked in Relays of ABB Spam 150C and 140C. Involved in modification of 132kv Switchyard. Involved in modification of Cement Mill. Monthly Energy Billing & Energy through Open Access. Online Power Export Scheduling and Billing. Spare parts planning/material management Shut down planning. Manpower planning/management. Team member of Quality Circle of Cement Mill Section Senior Executive - Erection/Commissioning/Maintenance Company Profile: Fertilizer anufacturer Electrical Engineer July 2008 to Dec 2010 Company Name:?Jaypee Associates Ltd Job Profile: Erection/commissioning/operation/maintenance of 4500TPD KILN Plant(kruppPolysius-TKIL) Plant Design-Holtec and Chunar Cement Factory of 2400 TPD Cement Plant and 132kv switchyard Industrial Training: One Month Training at NTPC Tanda- a thermal power plant. Have completed two weeks In-Plant training at JaypeeRewa Cement Plant. Achievements: Secured 1st position in ?APTITUDE? Test Organized by Electrum. Got Merit scholarship in B.Tech 2nd year. 2nd position in Intermediate in District. 3rd position in High School in the District Co-curriculas: Worked in the capacity of organizer in LTEE-06, a National Level Workshop organized by department of Electrical Engineering KNIT Worked in the capacity of organizer in the National Conference on ?Technical Challenges in Power System. Worked in the Literacy Camp at the school level for the poor children and prisoner. Future Goals: To become a part of the dynamic organization which believes in the technological development with the rapid pace of modernization. ________________________________________________________________________________________