plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 3/10/2025 4:16:16 AM ________________________________________________________________________________________ RefNo: CA - 23147 Gender: Male Age: 39 Designation: Engineer Highest Education Level: Diploma Current Gross Salary: 450000 450000 /Annum Expected Gross Salary: 585000 585000 /Annum Notice Period: 60 Days Education Details: CIPET (Processing & Material Testing)From Central Institute of Plastic Engineering & Technology for Processing & Material Testing, Aurangabad with 83.52% B.Sc. (PCM) From Dr.Babasaheb Ambedkar Marathwada University, Aurangabad in 2007 with 63.42% 12th From Yashwantrao Chavan College, Sillod with Maharashtra Board in 2004 with 57.23% 10th From From S.B. High School Bharadi, with Maharashtra Board in 2002 with 60.21% Skill Sets: Operating System: Windows 98/2000/XP/7 (MS Office) Certificate in Information Technology. Computer added three dimensional integrated application (CATIA R19-V.5) Plastics Processing Tech. Plastic Material? Plastics Testing? Product and mould design? Polymer Science Additives and Compounding? Costing and Management Statistical quality Control (SPC) Machine maintenance Work Experience: 15.3 Work Experience Details: Prod. Engineer - Plastic Molding Since Oct 2012 Company Profile: Manufacturer of Auto Parts Molding, Automobile spare parts & Shafts.? Production Engineer May 2009 to Sept 2012? Company Profile:?Automotive component manufacturer and supplier of exterior lighting systems, powertrains, electricals-electronics, body and chassis parts to leading passenger car and motorcycle segments Academic Project: Design Criteria in Injection Mould in previous company? Curricular Activities: Daily Plan entry in SAP. Daily Production confirmation in the system on hourly basis. Productivity on shop floor with EHS Policy? Manpower adjustment on shop floor. TPM implementation in the desired cell. Machine handling from 25T to 2000T (Makes SM, JM, Ferromatic, Windsor, JSW, Sumitomo, L&T, etc.) injection molding Machine. Hydro Clamping, Toggle Clamping & All Electrical machines are used. Mostly used Engineering Polymer. Nylon (Highly FR Grade), PBT (Nat 10-40%GF), POM, PEEK, etc. Taken New Tool Trials Break down analysis regarding tool and machine. Plan the required material (ancillary equipment) according to production plan. Handling Multi cavity molds (01 ? 32 cavities) Achievements: Member of a group, which carries 5?s activities on molding shop. Knowledge about TPM (Total Productive Maintenance)? Member of JH Pillar & KK Pillar. Facing audit of ISO-TS 16946/49. 7 QC Tool implementation against Product Quality Tool member of QCPC, TEOA (mainly BBS, Gemba Walk, LPA, etc), VSM, NVA, PFMEA. Productivity Improvement By technically study about Part design avoid some part catching issue and again provide some extra cooling channel, Cycle time reduce from 28 to 20 sec.etc. On account of part shot weight and mold height of two molds are shifted from higher Tonnage to Lower Tonnage machine (55 to 25 Tons) which reflects Power consumption By avoiding Premolding activity and reducing four stages out of eight stages which reflects 20% raw material consumption, 2man/shift saving, Machine production hours save approx. 96hrs/months as well as Power consumption by avoid pre molding activity, etc. Training: Human Behavior and its effect organized by previous company for 2 days. Ergonomics organized by present company for 3 Hrs. Behavioral Based Safety organized by present company for 2 Hrs. Future Goals: Where my hard work as well as my skills a drive and innovative abilities will be fully utilized and offering me the opportunity to expand my skills. Got the benefit from/to the organization. ________________________________________________________________________________________