plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/5/2025 5:27:49 PM ________________________________________________________________________________________ RefNo: CA - 24387 Gender: Male Age: 35 Designation: Engineer Highest Education Level: Post Graduate Diploma Notice Period: 30 Days Education Details: Post Graduate Diploma In Plastic Processing And Testing(PGD-PPT) From Central Institute of Plastic Engineering & Technology, APPTC, Balasore (Odisa), in 2013 with 78% B.Sc(Chemistry)From Avadh University (UP) in 2011 with?54% H.S.C. From UP Board Allahabad in 2007 with?62% S.S.C. From?UP Board, Allahabad in 2005 with?65% Skill Sets: Proficient in handling production operations for manufacturing products. Expertise in managing maintenance operations for reducing breakdown / downtime & enhancing operational effectiveness of equipment. Adept at carrying out various tests & inspection for various processes and checking the quality. An effective communicator with excellent relationship management skills and strong analytical, leadership, decision making, problem solving & organizational abilities. Basic knowledge of Computer . Internet Work Experience: 13 Work Experience Details: Production Engineer Since Nov 2015 Company Profile:?Manufacturer and supplier of plastic molded, injection plastic molded, water tank Job Profile: Handling Extrusion Machine.(Total No. Of Extruder 09) Kolsite Battenfeld KET- 92/28V(02 No Downstream 315mm, 110 mm), KET- 90/25V(02 No. Downstream 315mm, 110mm) KET-72/28V Argos(02 No Downstream 200 mm), KET-65/22V(03 No Downstream 110 mm)(KABRA). To Make AP, SWR, ASTM Pipes. Production Engineer July 2014 to October 2015. Company Profile : Manufacturing PVC Pipes Job Profile :? Handling Extrusion Machine. KET- 92/28V( Downstream 110 mm)KET-68/28V, KET-65/22V (KABRA) KTS200 (WINDSOR).To Make SWR, ASTM Pipes Junior Officer-Extrusion ? ? ? ? ? August 2012 to July 2014 Company Name :?Prince Pipes & Fittings Pvt. Ltd. Job Profile :? Handling daily scheduled Production and troubleshooting of process. Monitoring shift wise production ?to improve production efficiency. Implementing new technical method to improve the working system. Analyzing and providing feedback on new product after installation. Working as a Production Specialist in Technical Team. Total involvement in erection & commissioning of plant & successful stabilization for continuous production, cost control & analysis including all production activities and positive involvement in higher management decision & strategic planning. Production planning, Control & setting production targets. Production-rejection downtime analysis & making preventive action plan for rejection. Maximization of production, machine utilization while maintaining the quality & achieved the production targets. Using strong command on plastics processing, controls the rejection & fast trouble shooting. Participating in preventing & breakdown maintenance to reduce the machine breakdowns and increasing the productivity. 5S, Fire Training to people involved in quality circle. Making man & machine performance & efficiency reports. Team building, Manpower planning, handling & control. Area Of Experience Pipe Extrusion (PVC) UPVC (Production).? Core Competencies? Production Management Handling production activities involving working out various requirements & monitoring overall project operations for ensuring timely completion. Coordinating projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives. Monitoring the production at sites and review of project schedule, ensuring cost control within budget, planning for cash flow requirements, etc. Operations & Maintenance Planning & implementing the preventive & predictive maintenance schedules for improving the overall reliability and safety of plant equipment's & machinery. Implementing & maintaining all the activities in area of Production, Maintenance and New Facility Planning as per set standards. Conducting failure investigation analysis to identify gaps & take corrective measures so as to reduce equipment downtime & maximize plant availability. Erection & Commissioning Anchoring erection & commissioning of machines & equipment's and ensuring completion of project in minimum turnaround time effective resource utilization to maximize the output. Erecting and commissioning as well as conducting tests & inspections to ensure operational effectiveness of utilities; planning & effectuating maintenance plans for machines and equipment's. Future Goals: Growth ________________________________________________________________________________________