plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 10:17:10 AM ________________________________________________________________________________________ RefNo: CA - 25712 Gender: Male Age: 34 Designation: Supervisor Highest Education Level: Diploma Notice Period: 30 Days Education Details: Diploma Plastic From Govt. Polytechnic Valsad, G T U in 2013 with?6.64 CPI H.S.C. From?Sardar Patel High School?Bamangam? G.S. & H.S.E.B. in?March?2009 with?67.14%? S.S.C. From Sardar Patel High School, Bamangam,? G.S. & H.S.E.B. in March 2007 with 70.15% Work Experience: 10.8 Work Experience Details: Production Incharge -?Inj. Moulding Department? Since Jul 2016 Company Profile: Manufacturing Injection Moulded Articles.? Shift Incharge - Injection Moulding Department Sept 2013 to July 2016 Company Profile :?Manufacture And Distribution Of Oral Care And Household Care Products, Offering Products And Services That Embody State Of The Art Innovation, Quality, Delivery And Value Which Make Jewel The Supplier Of Choice Consistently. Job Profile: processing, M/c maintenance, Quality Test, Basic Electrical Work, And Other Axillary Equipment: Chiller, Compressor, Cooling Tower, Pump, Water Softening Plant Maintenance, Mould Loding, Any Work At Product Starting. M/c knowledge :L&T, Toshiba, ferrometik, Engel, arburg, DKV (vertical) multiplas (vertical) Negribossi, Mafatlal. M/c maintenance; Preventive Maintenance, Ring Plunger Change, Screw Barrel Change Die-hight Problem, Valve Problem, Contector Problem Solve Product Know; Tooth Brush, House Hold, Auto Motive Parts, Paint Contenerse, Pipe Fitting Parts And Other Products Make Material Know - PP, TPE, ABS, PET, PC, PC+ABS, Nylon, HIPS, GPPS, Etc. Mould Knowledge- Single Inj., Double Inj., Triple Inj., Two Plate, Three Plate, Multiplate, Multi Core System, Niddle Valve System, Jet Air System,hot Runner, Cold Runner, Runner Less Mould. Having Knowledge In ISO Audit Documentation, GMP Audit Documentation And 5s Also completed vocational training in Shaily Engineering Plastic Ltd.(Raniya) Savali, Baroda, Gujarat, India. Injection Molding Process In Quality Dept. Duration: 6 Month (Jan. 2013 to July 2013). Future Goals: Aspiring for a highly challenging career in the field of process and control in a global environment where knowledge and excellence are given their due and opportunities are provided to hone the skills/strength of individual for assuming greater responsibilities. ________________________________________________________________________________________