plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 12:39:49 PM ________________________________________________________________________________________ RefNo: CA - 27006 Gender: Male Age: 48 Designation: Senior Manager Highest Education Level: Graduate - Degree Current Gross Salary: 1520000 1520000 /Annum Preferred Location: India Notice Period: 45 Days Education Details: Degree In Polymer Engineering From Maharashtra Institute Of Technology, Pune University, In 1999 Diploma in Polymer and Plastic Engineering From Dr. Babasaheb Ambedkar Technological University, Raigad, in 1996 10th From New English School, Raigad, in 1992 Skill Sets: My experience In Plastic Industries has enabled me to become Plastic Engineering Professional who has covered almost all the aspects of moulding and moulds from development to final operations stage. I have hands on experience in moulding of all the Thermoplastic as well as Thermosetting resins from 60T to 2500T , 2K-Injection Technology, Gas-Injection, Rubber Moulding , Foam moulding and also in Paint Shop. I have handled all kind of moulds during stages of Trials, Approval, Validation, Production and Maintenance. Apart from possessing technical skills also manage Plant operations with improved productivity, quality keeping in view customer satisfaction with continual improvement. Work Experience: 24.4 Work Experience Details: Sr. Manager ? Project and Development (Corp-Development) Since Nov 2015 Company Profile: Leading Component manufacturer in Automotive & Home Appliances sector. Is a Supplier for Bajaj, Honda, Tata Motor, LG, Exide, Honeywell USA and having Six plant. Job Profile: Reporting to AVP - (Corp-Development) Acquisition of new businesses. Responsible from controlling operations to system implementation. Handled operation of machine ranging from 80T 2500T for one year. Handling project from RFQ stage to SOP. Develop new part from Tool feasibility, design input, Trial, Validation to handover to Operations. Part costing for all plant across India and deliver profit as per agreed business plan. New Capital purchase e.g Machines and Equipment for all the plant across India. Development of new tool, Jig, Fixture, SPM etc required for new product. Program management role from Tool feasibility to Part approval Develop new supplier during new product development stage. Coordinating with Tool Room and achieve mould development time line as per plan. Tracking and controlling project investment (Capex) within budget. Sr.Manager- Operations. (Plant Manager) Sept 2006 to Nov 2015 Company Profile: Automotive parts manufacturing company. Is Q1 Certified Supplier for Ford, TS 16949-2002, 14001 and OHSAS 18001 Certified. Job Profile: Reporting to VP-Operations. Responsible for the Moulding, Paint Shop, Assy, Planning,Tool Maintenance department Capacity Planning of Moulding, Painting Shop, and Assy. Excellent processing knowledge of raw materials PP, PC, ABS, PA6, PA66, POM, PBT, Rubber and so on. Achieving all financial target e.g Direct variable cost, EBITDA of Plant as per Budget. Active role in new machine selection and installation for new project. To collaborate with Engg, Program and BD Team in new product development and coordinating customer requirement. Final Approval of the Injection moulds, assembly fixtures, machines & auxiliary equipment's. OEE and Capacity Utilization monitoring and achieving as per target for all 39 Injection Moulding machines ranging from 80T to 1700T. Meet PPAP requirement of the customer and Maintain APQP. Setting up the assembly lines for new products in line with single piece flow and line balancing. Keeping track and achieving continual improvements and Cost saving projects. Adherence to Safety, Environment and health std of EMS/OHSAS. Sr Engineer (Moulding In charge)- Injection Moulding Nov 2004 to Sept 2006 Company Name: Lumax Industries Ltd Company Profile: Manufacturer of lighting systems under brand name of LUMAX for Honda, Maruti, TATA Engineering, Mahindra and Mahindra, Fiat, Hero Honda, Bajaj. Job Profile: Reporting to Production Manager. New machine installation and commissioning. New Plant Set up. New mould trials and ensure PPAP on time. Optimizing process parameters on Injection Moulding machines ranging from 100 T to 800T (CLF and Battlefield) and trouble shooting related to processing of plastics like ABS, Modified PP, PMMA, Poly-carbonate, PBT, BMC. Capacity Planning and Daily Machine loading Planning. Vendor development and support. Implementation of TS16949 and ISO 140001. Production Engineer - Injection Moulding Jan 2004 to Oct 2004 Company Name: Merloni Termosanitari India Ltd. Company Profile: Is engaged in manufacturing and selling of various types of Electric Water heaters, Gas water heater, bath tubs & solar water heater system under brand name of Ariston and Racold. Job Profile: Reporting to Production Manager. Managing production of Injection moulding and Polyurethane Foam shop for water heaters parts. Vendor Development and support. Optimizing process parameters on Injection Moulding machines 1000 T m/c and trouble shooting related to processing of plastics like PPTF. Mould maintenance. Production Engineer. Sept 2000 to Jan 2004 Company Name : KOSI Plast Pvt Ltd Company Profile : Supplier of Injection Moulded Plastic components for Kalyani Sharp India Ltd, PHILIPS, ONIDA, TATA Auto Plastic System Ltd, whirlpool, VEGA Auto accessories, IKEA. KOSI Plast Pvt Ltd is also involved in painting of plastics component and manufactures Painted Television Front cover including Speaker assembly for Kalyani Sharp, PHILIPS and ONIDA. Job Profile: Reporting to : Production Manager. Managing production of Injection moulding shop for TV cabinates, Audio parts, Automotive components and for refrigerator parts. Optimizing process parameters on Injection Moulding machines ranging from 140 T to 850T (Mitsubishi, Ferromatic Milacron, L&T Electronica) and trouble shooting related to processing of plastics like PP, ABS, HIPS, Modified PP, GPPS, Nylon, Polyacetal, Poly-carbonate, SAN etc. M/C maintenance and Mould maintenance. Mould include hydraulically operated core moulds and Hot runner moulds. Rejection and waste control. Machines installing and commissioning. Production Engineer in Injection Moulding Sept 1999 to June 2000 Company Name: Hiren Engg. Corporation Project work : Degree: Flow analysis of Injection Mould. Literature review on the design features of Hot Runner Moulds,Stack Moulds and Gas-assisted Moulds; their need, scope, advantages and limitations. Design and Analysis of Flow of a four impression 3-plate family mould by using Mould flow software. Suggest a suitable injection Moulding plant to manufacture small plastic gears. Diploma ? Reinforcement for Plastics. Literature review on the various material available for Reinforced plastics. Study the different processes of reinforced plastics. Training and professional courses : Six Month Course in Mould flow Software (MPI Version- 4.1) from MIT Pune during year 2005-06. One month In-plant Training in Godrej-GE Appliance Shirval during Degree. One month In-plant Training in SIRO PLAST (Compression moulding thermosetting parts) Raigad during Diploma. Certified as Internal Auditor for ISO 9001: 2000 during programme conducted by Zero Defect Consultant. Future Goals: Grwoth ________________________________________________________________________________________