plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/5/2025 10:32:23 PM ________________________________________________________________________________________ RefNo: CA - 34365 Gender: Male Age: 49 Designation: General Manager Highest Education Level: Diploma Current Gross Salary: 1600000 1600000 /Annum Preferred Location: Nagpur Education Details: Diploma in Mechanical Engineering from college of A.S.T.S. Wardha, Bombay Technical Board, Mumbai in Year 1995 - 1998 with 64 % of Marks. B. E. Mechanical from college of Y.C.C.E. Nagpur, Nagpur University in Year 2004 - 2008 with 60 % of Marks. MBA (Operation Management) from college of LTIMSR, Nagpur University in Year 2011-2013 with 63 % of Marks. Skill Sets: Leadership Team building abilities Flexibility / Adaptability Commanding and aggressive approach Problem solving tool approach Interpersonal skill Motivation Work Experience: 26.6 Work Experience Details: General Manager- Engineering (Maintenance & Projects) From - 2nd March 2020 to till date. Company profile -Leading ISO Certified Printing & packaging Industry Capacity 1000 MT/Month. Job profile - Overall responsible for the Planning, Organizing & Controlling of the Projects and Plant Maintenance such as Mechanical, Electrical, Utilities, Civil work and Preventive maintenance for smooth operation of plant. To set the departmental objectives in line with quality policy and organizational objectives. In addition to above acting as a Safety Advisor to comply the Safety requirements as per IS 14489:2018. Daily monitoring on the Breakdown& consumption data such as power, fuel, water, overtime, spares & consumables consumption. To ensure successful completion of Capex Projects, Process Improvement projects & new machine set-up. P & ID, GA & Isometric Drawings approval and erection & commissioning of equipment as per plant layout. To review and approve the documents such as SOP, WI, Checklists, Statutory requirements etc. To review & improve of breakdown trends with maintenance team for the reliability of Plant. To ensure proper maintenance of preventive & predictive as per plan for smooth operation of plant. To ensure all mother equipment and standby equipment are in healthy condition. Renewal of annual contract of vendors based on the effectiveness in services and cost involved. Incorporation of new equipment and technology by giving Safety, Reliability and ROI approach. To establish, maintain & update the ISO 22000 & 9001 Quality management systems requirements. Cost Management: To Establish and achieve departmental objectives such as Power, Fuel, Water, Spares cost, Uptime of Critical machines, Preventive Maintenance and On time Completion of projects. To participate in the cost committee meeting for company annual budget& cost cutting on expenses. To Prepare, monitor and control of Expenses (CAPEX & OPEX) in relation to the annual Budget of engineering. To control and eliminate the wastages by applying SGA and Kaizen. Material Management: Periodically review, monitor and control the status of the critical spares, consumables and chemicals consumption and its requirement. To evaluate and develop the vendors for job works and indigenous spares of imported machines. Statutory and Legal Requirements: To comply all statutory and legal requirements such as Electrical Inspector, MSEB, MPCB, Factory Inspector, PESO, Fire department and local bodies. To ensure Testing and calibration of equipment & tools by NABL approved competent authority. To Update and maintain the documents such as ISO 22000:2018. Training and Development: To ensure Employee development, motivation and multi-skilling through Training. To conduct & give the training related to QMS & Plant safety. Knowledge about the SAP system. Sr. Manager - Engineering From - 4th April 2017 to 25 th Feb 2020 Company profile - It is leading export oriented Al-Paste manufacturing ISO 9001:2015 JV between Toyal Group- Japan & MMP India Company. Manager - Engineering from 22nd July 2012 to 3rd April 2017. M/s PIX Transmissions Limited Factory Manager From 20th July 2007 to 21st July 2012 M/s Vasudhara Dairy ________________________________________________________________________________________