plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 3/10/2025 10:16:23 AM ________________________________________________________________________________________ RefNo: CA - 37394 Gender: Male Age: 31 Designation: Maintenance Engineer Highest Education Level: Graduate - Degree Preferred Location: Silvassa Notice Period: 30 Days Education Details: B.Tech From Oriental University Year 2016 12 From S.N.S College, B.S.E.B Year 2011 10 From R.D.A High School Year 2009 Skill Sets: Computer skill (MS Word, Excel, Power Point) Work Experience: 8.9 Work Experience Details: Maintenance Executive From : 2020 To Till Date Company Profile : Manufacturer of GI wire, Hot Dipped GI Wire, Fencing Wire, Chain Link Fencing Wire, Galvanized Ironn Wire To maintain the preventive and breakdown record as per ISO 2008-2015. Good understanding of Electrical Drawings, Planning of Projects, Erection & Maintenance. All machinery data update if have any technical problem than in well handle them. I know that all electrical cables were supper in plant and such electrical panel. Regular analysing of organisations Electrical Load Consumption with Ratio and analysis. I have knowledge control drive for control electrical supply. I have knowledge of extrusion machine all maintenance. I have knowledge of wide web embossing machine all maintenance. I have knowledge of air compressor & vacuum pump all maintenance. I have knowledge of polymer feeder all maintenance. I have knowledge of pelletizes all maintenance. I have knowledge of lamination printing machine all maintenance. I have knowledge of slitting machine all maintenance. I have knowledge of RO & DM water plants all maintenance. I can solve any electrical and electronics issues which will be my best efforts to solve it. Handling of electrical load as per requirement. I Have knowledge of Wire drawing all maintenance. I Have Knowledge Of Gi All Maintenance MINOR-PROJECT: Title : 3 Phase Fault Analysis With Auto Reset Description: The project is designed to develop an automatic tripping mechanism for the three phase supply system. The project output resets automatically after a brief interruption in the event temporary fault while it remains in tripped condition in case of permanent fault. MAJOR-PROJECT: Title: Simulation and performance and parameters analysis of single phase full wave controlled converter using PSIM Technologies: PSIM Simulation Description: Power electronics Controlled converter is a type of semiconductor converter which is used for the conversion of AC to DC, DC to AC, AC to AC, DC to DC power. Maintenance Engineer From : 23/04/2018 to 24/02/2020 Company Profile : Manufacturer of Holographic Film and holographic products. Maintenance Engineer From : 13/05/2016 to 20/04/2018 Company Profile : Polymers Ltd Future Goals: Seeking for Assignments in Maintenance, Installation, and Commissioning & Automation Design with a reputed organisation. ________________________________________________________________________________________