plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 4/2/2025 4:48:55 PM ________________________________________________________________________________________ RefNo: CA - 37615 Gender: Male Age: 48 Designation: Sr. Manager ? New Product Development Highest Education Level: Graduate - Degree Preferred Location: Mumbai Notice Period: 30 Days Education Details: B.E (Industrial Engineering) - Indian Institute of Industrial Engineering Year 2014 Inspection & quality control (2 weeks) Forman Training Institute Year 2000 Diploma in Mechanical Engineering Rama Krishna Polytechnic Year 1998 CNC programming & operation, (3 months) Indo Danish Tool Room, Year 1998 Skill Sets: Strategic Process Planning New Product Development & Trial Cost Management Quality Management Operations Management Manpower Planning & Training Strategic Sourcing & Vendor development CAD/CAM SAP R/3 Work Experience: 27.1 Work Experience Details: Sr. Manager New Product Development From : 9th March 2021 to till date Company Profile : Manufacturer of world-class plastic blow-molded and injection-molded products. Job Profile : Responsible for the cost estimate and negotiation with the mould maker. Managing the projects from initiation to close with efficiency and customer satisfaction. Actively participating in project management & new project development including performance assessments review with the CFT team. Involvement for the metal part development of hospital bed assembly as per customer requirements. Involvement for new products development design review as per products requirements. Maintaining the APQP and Gantt chart as per the project requirements and monitoring the project progress accordingly. Work Achievement: By implementing several SOP, awareness, training standard practice I have managed to increase FTR by 68% These rejection rate come drastically up to 50%. also rework activities get reduce. Mould design review & suggestions in production tools. Regular visited and followup with the mould maker for analyized mould progress. completing the task within timeline. Trained the manpower in part assembly line setup, SOP, and checklist for increased the final assembly production. Asst Manager (Production) Tool Room & CNC From : June2018 to August2020 Company Profile : Manufacturing of complete assembled products for electrical panels, switchgears, circuit breakers Job Profile : Lead and coordinate the entire mould development/ maintenance planning & man machine utilization. Responsible for machine maintenance, quality, cost, new mould development timeline. Responsible for technical solutions and coordinated with internal department. Responsible for cost analysis, pricing negotiation, vendor management. Implementation system of 5S in shop floor. Work Achievement: I have developed the new vendor for critical machining activities to achieve the quality and completion task on timeline. Also removed the bottlenecks for some critical machining like Wire cut, CNC turning, grinding. Manager (Tooling and Commercial) From : Dec2016 to May2018 Company Profile : M&A TOOL MAKER Job Profile : Responsible for new Mould development taking care of quality, cost, timelines. Design review & coordinated with internal department. Responsible for the attain mould trial and troubleshooting. Work Achievement: Improvement in data management, Process quality and old mould repaired. 25% production efficiency increased. Asst.Manager From : Nov07 to Nov16 Company Profile : Integrated CAD/CAM Solution (P) Ltd Job Profile : Coordinate project activates in accordance with company quality system. New Mould development Project Planning & scheduling, trial, vendor, and cost management. Interview with supplier representatives regarding technical specification, cost, quality. Achieves mould cost reduction through value engineering and supply chain optimization. Develop and implementation manufacturing process in co-operation with internal & external team. Maintains and regular monitoring of cost sheets of finish product/new mold RFQ. Ensure that all the measuring device & machine are calibrated on time. Quality assurance on the machine and others external arrangements. Implementation system of 5S in shop floor Work Achievement: Developed the comparative critical machining vendor to removed bottle neck & dependency with comparative price. I have developed many vendors like 6 nos CNC machining, 4 nos wirecut, 4 nos EDM, Conventional extra. Regular audit with vendor for setup the process, checklist for quality improvement. Continuous improvement focused on quality & process planning to reduce the rejection. CAD/CAM Executive From : July 06 to Nov 07 Company Profile : S.D ENGINEER Job Profile : Coordinate with vendor & customer for achieve target. Analyze the process planning. Generate CAD/CAM Programming Supervision of CNC m/c. Sr CNC Operator From : Nov02 to June2006 Company Profile : Arc International Middle East LLC Job Profile : Operating & Supervision of CNC m/c. Generate CAD/CAM programming Executive CAM From : May2001 to Oct2002 Company Profile : Pinnacle Die& Mould (P) Ltd Job Profile : Analyze the process planning. Generate CAD/CAM programming. Supervision of CNC m/c senior operator cum programmer From : Nov98 to April01. Company Profile : Nucleus Engineer Job Profile : Analyze the component requirement. Prove out the component. Set the batch production. Supervision of CNC m/c. Future Goals: To Lead Business process for continual improvement in a Global Organization. ________________________________________________________________________________________