plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 6:31:59 AM ________________________________________________________________________________________ RefNo: CA - 4315 Gender: Male Age: 50 Designation: Department Head Highest Education Level: Diploma Current Gross Salary: 450000 450000 /Annum Expected Gross Salary: 1400000 1400000 /Annum Preferred Location: MALAYSIA, SINGAPORE, SINGAPORE, CANADA, QATAR, OMAN Notice Period: 30 Days Education Details: POST DIPLOMA IN PETROLEUM REFINERY ENGINEERING with First Class DIPLOMA IN MECHANICAL ENGINEERING with First Class Skill Sets: Plant Start-up, Shut ?down, Trouble Shooting, Plant Emergency Handling & Fire Fighting. Erection, Pre-Commissioning, Commissioning, DCS/PANEL operation. Distributed Control System (DCS-C++, 2000-centam-cs-YOKOGAWA?), CAUSE & EFFECT diagrams, PFD/EFD Study, SDM activities & Safety awareness. Work Experience: 25.4 Work Experience Details: Shift - In Charge (PROCESS) ( DCS / PANEL/FIELD ? Operation - Controller) Since 1999 to till date Presently working with leading petrochem maker in India AREAS OF EXPERTISE: Responsible To Control The Following Activities By DCS & PANEL FROM CENTRAL CONTROL ROOM. Reactor-section: Plug Flow REACTOR With The Catalyst Of 14.5 Tons Of Pd/C. Pressure: 80kg/cm2 (JIS) & Temp: 280.C, Controlling Process Reaction, Burning, Combustion, Temperature, Pressure & Level controlling. Crystallizing ?section: 04 No.CRYSTALLIZERS With Agitators Of Volume 93 M3/ Each 10 KG/cm2 To (-)0.5 KG/cm2 Range, Vacuum type with Steam?ejector, with pressure ?unit control. Compressor- section: Centrifugal Type COMPRESSOR (4 -Stage) Developing Pressure: 17 kg/cm2 (JIS) with Flow: 200 knm3/hr. Power taken 18,000 kw. Accommodate with Steam ? turbine & Gas ? expander as auxiliary power saving arrangement Vendor. Gas-expander section: RADIAL Type GAS- EXPANDER (2- Stage) used Reactors off gas at the pressure of 15.7 kg/cm2 to save 8000 KW power. Steam-turbine section: Impulse Reaction Type STEAM TURBINE (2-Stage) Used 6s, 0.5s & 0.7 ata. (Generation from Distillation ?section) Steam to save 7000 KW power. Separator ? Section: Vertical And Horizontal Decanter Of Capacity (75 Tn/ Hr.& 62 Tn /Hr.) From TOMOE (Japan) Controlling & Trouble Shooting From DCS & Field. Hydrogen Generation Section: Production Of 300 NM3/Hr. Purified Hydrogen (<1ppm CO & < 10 ppm CO2) Through PSA UNIT & Flow Reactor From HYDROCHEM. Distillation - section: AZEOTROPIC-Thermo-siphon (6s- steam) type.123.C Temperature and 0.5 kg/cm2 Pressure with Total - reflux, side cut product to separate ACETIC ACID & WATER & produced 0.7 ata. Vacuum ? steam by Ejector arrangement. Drying ? section: Belt filters (Vendor: PANEVIS. HOLLAND) with 150 Tn/ hr. capacity accommodate with steam heating DRYER 180 TN/ Hr, Heat Transfer Capacity 1200m2 From TOMOE (JAPAN) with recalculated inert gas. Controlling Parameters & Trouble Shooting From DCS. Conveyer section: Screw conveyer, Rotary conveyer, Flight conveyer & Bucket conveyer along with recharging unit. Catalyst generation & recovery section: Familiar with COBALT ? ACETATE and MANGANISE- ACETATE Generation & Recovery Section. Boiler & steam generation control: Boiler & Kettle type Reboiler to produce, control & balancing 6s, 3.5s, 1.5s, 0.5s Header Pressure From DCS. Raw-material handling. like *Acetic-acid *HBr *Para-Xylene *MA. ADDITIONAL COMPETENCIES : Familiar with ?QC? (QUALITY CIRCLE) activity. Familiar with ?TQM? (TOTAL QUALITY MANAGEMENT) activity. Familiar with ?TPM? (TOTAL PRODUCTIVE MANAGEMENT) activity. Familiar with ?5s? activity. Exposed to ?Kaizen & Hatto-Hayari?. Trained in Plant-Safety & Fire-Fighting. Familiar with ISO -9001, ISO-14001, OHSAS-18001, Accident &Incident Cause, Analysis & Reporting, IMS, Safety audit, etc. Familiar with MSDS (Material Safety Data Sheet) for plant safety as well as human safety. THE COMPANY POLICY. I follow: Standardization, rules & regulation of ISO-9001(Quality) Standardization, rules & regulation of ISO-14001(Environment) Standardization, rules & regulation of OHSAS. Safety, Health & Environment (SH & E) Policy. Knowledge of ASPECT & IMPACT assessment to each employee. Knowledge of HAZARD & RISK assessment to each employee. Permissible limit of waste (Solid / Liquid /Gas) as per WEST- BENGAL GOVERENMENT POLLUTION CONTROL BOARD. SAFETY ASPECT: Safety comes first in all operation to satisfy zero-accident target with maximum productivity. Familiar with Fire-fighting & Plant- Emergency control handling techniques & regular basis Mock-Drill. Awareness of using proper PPE (Personal Protective Equipment) in proper situation. Familiar with SIC (Site Incident Controller) & SEC ________________________________________________________________________________________