plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 2:04:31 AM ________________________________________________________________________________________ RefNo: CA - 4436 Gender: Male Age: 61 Designation: Senior Executive Highest Education Level: Diploma Current Gross Salary: 475000 475000 /Annum Preferred Location: Anywhere Notice Period: 90 Days Education Details: Draughtsman Mechanical Course from Technical Board with 82% Pre-university course from Andhra University with 47% Skill Sets: Project implementation & development of machines. Work Experience: 35.3 Work Experience Details: Senior Executive (A.M) July 2007 to till date Presently working with a leading company. Engineer Aug 1992 to July 2007 Worked with Samtel Group. Joined as T A in Equipment division in 1992 Promoted in the year 1995 from T A to S T A Promoted in the year 1998 from S T A to Assistant Engineer Promoted in the year 2001 from Assistant Enginer to Engineer. Consultant for Nalco in Design Department. From 1990 to 1992 Worked with M/s SYTCO. Draughtsman From 1989 to 1990 Worked with T.M.T. Ltd. Training: I-DEAS-8 Software Training MDT-1.2 R Software Training Auto Cad Training ISO -internal Auditor Training Projection under taken: 1. Title: Sensing and Rotate Automation Role: Re engineering and induction Reduction. Duration: 120 days B M S C Area. Description: This is most critical machine in BMSC area. The function of the machine is to identify the in coming panel in correct orientation so that the mask can be removed for De- pairing as per desired position. 2. Title: Pick & Place Robot Automation Role: Re engineering and Man power reduction. & Comfort Duration: 110 days P B Area. Description: This is critical machine in P B area. The function of the machine is to pick Hot panel of 80 deg C" from roller conveyor and place on to Plastic chain conveyor and from the load on the Over head conveyor for next operation. 3. Title: Load and Unload Lifter Automation. Role: Designing and Execution of Equipment. Duration: 60 days B M S C Area. Description: This is critical machine in BMSC area. The function of the machine is to Unload the in-coming panel from Over Head Conveyor and to pass on to next function and after completion of operation again reload the panel on to moving Over Head Conveyor. 4. Title: Frit Seal Automation System. Role: Designing and execution System. Duration: 90 days Funnel Preparation Area Description: This is most critical machine in F.P. Area of Middle process. The function of the machine is to remove the dust partials from inside the bulb by means of two process, Air pounding system and Air flashing in side the bulb, to eliminate rejection from dust. 5. Title: Heat Shrink Banding 6. Title: De-Banding from rejected Tube ________________________________________________________________________________________