plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 4/25/2025 2:47:09 AM ________________________________________________________________________________________ RefNo: CA - 4773 Gender: Male Age: 54 Designation: Manager Highest Education Level: Graduate - Degree Preferred Location: Anywhere Education Details: B.E (Electronics & Power) from Nagpur University in 1993 to 1996. Diploma (Electrical) from M.P. Technical Board in 1989 to 1991. MS office, MS Projects, `SAP PS Modules, Auto CAD - 2000, Moderate knowledge of `C`, ETAP - Substation / System Designing tool. Skill Sets: Work exposure in the field of Designing, Planning, Project execution, Project co-ordination, Material procurement, Maintenance of electrical system write from LV voltage to HV and EHV Voltage level including the EHV substation and EHV Transmission line. Work Experience: 27.5 Work Experience Details: Manager in Project Marketing Department Dec 2006 to till date Job Profile: Tendering / Proposal & Estimation for substation and plant Electrifications. Project Management from procurement & Execution point of view. Role As Planner, Procurements and Project coordinator. Senior Manager in Power Evacuation Department Aug 2003 to Dec 2006 Worked with Suzlon Energy Ltd. Project Name: Power Evacuation Project Job Profile: Preparing bills of material for EHV sub station and EHV Transmission line. The designing of sub station for voltage level 66/33 kV - 25 MVA, 66/11 kV - 25 MVA, 132/33 kV - 100 MVA, 220/33 kV 150 MVA. Substation, 220/33 kV 2x100 MVA Substation at Valve, 220/33 kV 4x100 MVA Substation at Jamade, 220/33 kV, 2x100 MVA Substation at Ghatnandre Maharastra. Carrying out optimum design studies for transmission line voltage & conductor capacity for evacuation of power. Carrying out load flow studies for flow of power in the state electricity grid. Preparing the cost estimate for the power evacuation work comprising EHV substation and EHV lines, modification in EB EHV substation. Preparing the evacuation scheme for submission to EB. Technical and commercial bid evaluation, negotiation with the bidders for placement of order for EHV substation and Transmission line. Carrying out the detailed design engineering for equipment s, earthing, cabling, cable sizing, bus scheme, fault level calculation and protection schemes. Support Engineer for Design Engineering Services Dec 2001 to July 2003 Worked with TCE Consulting Engineers Ltd., Mumbai Project Name: Design Engineering support. Job Profile: Responsible for detailed engineering & designing, tender specification. The work encompassed - Detailed engineering & designing of electrical equipment (e.g. earthing, lightning & illumination design, fault level calculation, voltage-drop calculation and cable sizing, equipment protection, power-factor improvement, etc.) Preparation of SLD, GA & Layout drawings, control & protection scheme. Preparation of Technical specifications/ tenders for electrical equipment and systems. Technical and Commercial Bid evaluation. Worked with RUIDP Project and was responsible for detailed engineering & designing for 11kV & 33 kV transmission line, tender specification. Project Coordination Engineer Dec 1999 to Dec 2001 Worked with Suzlon Energy Ltd., Ahmedabad. Project Name: Wind mill Projects Job Profile: Planning, Procurement and co ordination with site and vendors as per following job profile. Preparation of specifications, Vendor appraisal, Bid Analysis, Review of vendor drawing and Recommendation and coordination with Purchase Department for order placement and follow up for the following Equipment Distribution Transformer, LT PVC power and Control cable, XLPE Cable, Outdoor Vacuum Circuit Breaker, Instrumentation Transformers, Lightning Arrestor, Conductor, Pin/Disc/Post Insulators and Transmission line Hardware suitable for DOG and Panther conductor, Isolators, GODs, DO Fuse and Metering cubicles. Type test for Distribution Transformer and Isolator, Metering Cubical at M/S ERDA, BARODA and Inspection of following HT / LT Equipment`s / material at vendor`s works. Power & Distribution Transformer, Instrumentation Transformer, Isolator, LT/HT Power and control cables, Lightning Arrestor, Conductor, Circuit Breakers, GODs and DO Fuse. Identification of rectification / repair requirement for 11kV / 66 kV Wind power evacuation sub station at Lamba, Gujrat, Preparation of Bid documents for the same, Bid analysis and recommendation. Preparation of SLD, Equipment Layout, Earthing Layout for Wind power evacuation substation including individual windmill substation and group metering substation. Worked as Site supervision engineer on the following job profile. Erection and commissioning of Floor mounted Transformer, H - Frame substation for individual windmill. Electrical Engineer in Operation and Maintenance Nov 1997 to Dec 1999 Worked with Gopala Polyplast Ltd., Santej (Ahmedabad). Job Profile: The job profile involve routine and preventive maintenance, Fault finding to reduce down time and Rearrangement of load distribution on Grid and DG Sets. Operation and maintenance of 415 V distribution system consist of AC / DC Motors, PCC and MCC panel. ________________________________________________________________________________________