plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 4:13:32 AM ________________________________________________________________________________________ RefNo: CA - 5010 Gender: Male Age: 44 Designation: Senior Executive Highest Education Level: Diploma Preferred Location: Anywhere Education Details: Diploma in Mechanical Engineering from Arulmigu Palaniandavar Polytechnic, Palani in the year of April 2000. Computer Knowledge AutoCAD 2000, Microsoft Windows XP version ( Microsoft Office ) Skill Sets: Production, Planning & Project Work Experience: 24.6 Work Experience Details: Senior Engineer July 2000 to till date. Company Profile : An ISO 9001 : 2000 certified company and a Turn key Automation system having 5 sister concerns. Specialist in Design, Manufacturing & supply of different types of SPPM machines, All type of industrial use conveyors, Nuclear Reactor Components, Heavy Engineering Components, specialist in Nuclear Reactor Coolant channel Refurbishing work & Site Engineering Services. The customers are:ISRO, SHAR, DRDO, DMRL, NPCIL, BARC, LG, HP, BPL, CAT, HYUNDAI, MARUTHI, FORD, HAL, HLL, WHIRLPOOL, HOTLINE, SAMTEL, VIDEOCON, PANASONIC, MOSER BAER, TOYOTA KIRLOSKAR , ASHOK LEYLAN Job Profile Project Planning, Manpower planning , Cost Estimation, Project Budget preparation, Execution, Assembly, Erection & Commissioning of SPPM machines, All type of conveyors, All type of Piping work, Hydraulic & Pneumatic line installation & Fabricated structure in customer place with following ISO standards. Also having knowledge in ERP operation. Project Plan : Attending Initial meeting along with Project Team. Reviewing relevant documents to get full knowledge about Project. Getting information from all depts. with duration to prepare a Project Schedule. Forming Execution Team with appropriate Manpower. Co ordinate with QA dept to prepare a QAP & getting approval from Customer. Monitoring Schedule for on time delivery. Arranging Project Team meeting to discuss the issues & to achieve the schedule. Attending Customer visits & Inspection and getting clearance on stage wise assy. Follow up with Vendor & Purchase dept to get Manufactured & Bought out parts for Assy. Assembly : Receiving Layout, assembly & part drawing from design dept through PPC. Layout marking in work shop. Receiving Equipment parts from Vendor, In house & Purchase on time. Co ordinate with Internal QA dept for Components & Assy inspection. Assembly of the equipment as per design specification & Trial run at shop. Arranging Customer Inspection before despatch from shop. Dismantling of the equipment and despatch to customer place. Erection & Commissioning : Site Study & Budget preparation before start up of E&C. Preparing E & C Schedule. Hiring of Local Manpower & other requirements to run the site. New layout marking in customer place as per site requirement. Attending Meeting with Customer officials to monitor the E&C schedule. Assembly of the Equipment as per drawing. Connection of Utility lines like Air, Water, Gas etc. Trial runs of the Equipment & Process setting until trail production. Minutes of Meeting with customer. Receiving E & C satisfaction certificate from customer after completion of the project. Sending Daily Progress Report to Head office. Maximum utilisation of Man hours to reduce the E&C duration & cost. Attending Breakdown Maintenance and AMC calls. Maintaining documents as per ISO 9001 : 2000 standard. Co-operating with all team members & customer to achieve the schedule. Handover the machine to customer with full documentation. Train the customer technicians to work in supplied machine. Projects Handled : M/s. Hotline CPT Gwalior Worked as a Deputy Team Leader for Dismantling of 17 CDT plant at Malaysia ( M/s. Hitachi Display Devices Ltd.) and E & C in Gwalior, India. As per customer requirement this plant has been converted from 17 CDT to 21 CPT and commissioned successfully. Worked as a Deputy Team Leader for Dismantling of 17 CDT plant at Singapore ( M/s. Hitachi Display Devices Ltd.) and E & C in Gwalior, India. This plant has been commissioned successfully. M/s. Hotline CPT Gwalior ( 8 months ) Worked as a Team Leader ( Back End Process ) for Dismantling of 19 CDT plant at Singapore ( M/s. Hitachi Display Devices Ltd.) and E & C in Gwalior, India. The above mentioned CPT & CDT plant system involves Specially designed Coating Robots, Auto Transfer Pick & Place, Automatic Indexers ( various types of Heads ), Hydraulic Press Machines, Synchronization of all Machines for complete Automation, Automatic Inspection camera units, Heavy voltage Aging equ ________________________________________________________________________________________