plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 4:25:26 AM ________________________________________________________________________________________ RefNo: CA - 6383 Gender: Male Age: 51 Designation: Senior Executive Highest Education Level: Diploma Current Gross Salary: 500000 500000 /Annum Expected Gross Salary: 700000 700000 /Annum Preferred Location: Anywhere Education Details: Post Diploma In Machine : CIPET, Ahemadabad Maintenance (All India 10th Rank) Diploma In Electronics & Electricals: Technical Board Of Communication Karnataka (First Class, Year Of Passing 1996) Intermediate : Iecb, Jharkhand S.S.C : Bseb, Jharkhand Computer Knowledge : Computer Ms Office, Word, Excel Skill Sets: Electronics and Electrical Plc Controls Robot Programming Hydraulic Basics Modern Maintenance System Like Tpm, Kaizen, 5s, Six Sigma. Calibration And Documentation. Error Proofing Low Cost Automation Work Experience: 27.9 Work Experience Details: Senior Engineer Maintenance (Moulding) Deptt. Since Oct 2003 Presently working with leading manufacturer of optical media Job Profile Mechanical, Electrical And Electronics Breakdown And Preventive Maintenance, Maintenance Planning, Scheduling, Spares Planning, Machine Erection, And Commissioning, Tpm, Kaizen And Iso Activities. Machines Attended : Plastic Injection Moulding Machines Like Jsw (Japan) Sumitomo (Japan) Nestaal (Germany).Mechnism Ram Type Locking, Toggle Type Locking, Hydro-Mechnical Locking, Screw Rod Type Injection & Charging. Controls: Computer Digital Control, Plc Controls And Contractor Logic. Associate Member - Maintenance Department From Aug 1998 to Sept. 2003. Presently working Tata Auto Plastics Systems Limited. QS 9000 And Iso 14001 Company Leading In Automative Moulded And Painting Components, Having Collaboration With Sommer Allibent Ind France. Job Profile Preventive Maintenance . Breakdown Maintenance And Maintenance Of Plastics Injection Moulding Machines 60t To 2700t With Robots Ssembly Lines Having Ultrasonic Welding Machines, Vibration Welding Machines, Hydraulics Presses, Presses, Pnuematic Presses, Assembly Fixture And Other Supporting Equipment Like Hopper Loader, Mtc, Q.M.C Utilities Like Chiller, Compressor, Cooling Tower, Diesel Generator (1250 Kva) Attending Breakdown Of Hot Runner System More Than 150 Moulds Like Bumpers, Bash Board, Abc Pillar Etc. New Plant Setup Erection Commissioning Of Machines And Utilities. Pick And Place Robot Programming For New Components. Calibration And Documentation Of Machines Fro Q.S.9000 Knowledge Of Advance System Like Tpm, Kaizen, 5s, Six Sigma. The Accomplishments Are As Follows: Development In Flaming System Through Robot. Indigenous Development Of Imported Spares. Implemented Autonomous Maintenance On Moulding Machine And Reduced Down Time of Machine Below2% Six Sigma Project Energy Saved From 2.5 Units/Kg To 1.8 Units/ Kg Trainee Engineer July 1996 To July 1997. Worked Usha Beltron Ltd Future Goals: Senior Manager ________________________________________________________________________________________