plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 5:22:48 AM ________________________________________________________________________________________ RefNo: CA - 6575 Gender: Male Age: 55 Designation: Senior Executive Highest Education Level: Graduate - Degree Current Gross Salary: 250000 250000 /Annum Expected Gross Salary: 350000 350000 /Annum Preferred Location: MUMBAI, PUNE, NASIK, AURAGABAD, JALGAON, GOA, DAMAN, SILVASSA Notice Period: 45 Days Education Details: B. E. (Electronics) Passed from Amaravati University, SSGMCE Shegaon. (Year-1992 with 62%) Skill Sets: More than 13 years experience. Through Knowledge of operations, Services and activities of maintenance. Excellent Knowledge about maintenance activities (Elect, Mech, Hydraulic) of Injection Moulding Machine Shop (total 118 Injection Moulding Machines) and related Utilities. Remarkable Knowledge of Repairing & Maintenance of Programmable Logic Controller (PLC). Fault Finding, Trouble Shooting, Card repairing. Also about In House retrofitting work of the PLC. Profound Knowledge of occupational hazards and standard safety Practices necessary in area of work assigned. Knowledge of the Maintenance of Utilities like Cooling Tower, D.G Sets, Air Compressors & Overhead Cranes. Maintenance of Pump Houses, and to run the Diesel Generators Achieved cost reduction through value engineering, reduction in breakdown, rework and waste elimination. Maintenance Plan analysis, Production Plan analysis, Engineering Budgets & costs and Purchase Planning Work Experience: 29.7 Work Experience Details: Sr. Maintenance Executive Since Dec. 2003 Electronics engineer From April 1995 to May 2001 Company Profile : Pioneers & manufacturer of PVC FITTINGS & PVC PIPES. In India. The company manufactures all kind of PVC Fitting ranges such as Pressure Fittings, ASTM Fittings, SWR Fittings; PPRC (PP-Random) Fittings, CPVC Fittings and Also fabricated items. The company also manufactures PVC pipes of ranges such as Agricultural pipes, ASTM pipes, SWR pipes, and submersible pipes Role I join as an electronics engineer in the maintenance dept. of the Injection moulding machine division. During 10-year period, responsibilities are, All Types of maintenance (Electrical, Hydraullic, Mechanical) of total 118 no. of Injection moulding machines of different national as well as international brands like Klockner Windsor, Super Master (Taiwan). Mafatlal-Nigata, Jet Master, Sumitomo & L.G. Moulding machines. In addition, Haitain (China). The details are given separately. Repairing & Maint. Of Programmable Logic Controller (PLC).Fault Finding, Trouble Shooting, Card repairing. In house Retrofitting work of PLC To work out for the Machine seq. & software modifications required for retrofitting of Indigenous PLC Maintenance of Utilities like Cooling Tower, D.G Sets, Air Compressors & Overhead Cranes. (D.G. sets up to capacity 750 KVA, 630 KVA, 180 KVA, Overhead crane up to 5-ton capacity 09 nos.). Maintenance of lathes, milling machines, Radial drill machines, Surface grinders. Maintenance of Grinders, Pulvalisers, Socketing Machines, Threading Machines etc. To plan, Supervise & Implement the preventive maintenance schedule, Maintenance Plans for electrical systems. Implement preventive/corrective actions for defects, Improvement projects. Design & develop & modify the circuit & the machine, if necessary. To run the D. G. S for the Captive Power generation. Maintenance of various types of Process Instruments, & Calibration of Instruments.& Repair of Electronics & Electrical equipments / instruments such as Power supply, Weighing Balance, Temperature Controller, Timers, D.C.& A.C. drives Soft starters etc To implement the ENERGY Saving Techniques. To monitor, analyze & control the use of energy on daily basis To assist in implementation in major Projects. Installation & Maintenance of Commissioning of Electrical Systems. Maintenance of the Control Panels, A.C.B.S, & Maintenance of APFC ( Automatic Power Factor Control Panel ) Maintenance of the Transformer Yard (33/11KV, 5000 KVA 01 Nos. 11KV/440V, 1000KVA 04 Nos.), Switchgears etc Calculations for Panel sizes, Cable requirements and switchgears. Preparation & Execution of the lighting layouts for large sized machine shops, canteens, office, yards and the dormitories. Also involved in the operations such as to indent the material, quotation procedures, inventory control & to communicate between the vendors. Shift-In-Charge From June 2001 to July 2003. Re - Source Eet (India) Pvt. Ltd. Jalgaon. Processing of Municipal solid & liquid waste. Processing of Agricultural & Organic waste. Electricity generation Conversion of waste to energy. Waste handling & Recycling. Role Works as a Shift-In-Charge responsible for maintenance as well as production activities. To look out maintenance of DCS system. Maintenance of ac drives ABB make up to 150 H.P. motor capacities. Maintenance of several system equipments such as conveyors of various types such as (chain, screw, belt.).Also, look out towards maint. Activities of Shredders, pulverizes, etc. To carry out the maint of 750 KVA. Generator, hot air gen etc. To look out maint of OLTC Transformer (800kva). Electronics Engineer in Maintenance Dept From Sept. 1994 To April 1995. Jain Irrigation Systems Ltd. Jalgaon. Jain Irrigation Systems Ltd. is pioneers & major manufacturers of Agriculture Plastic moulded equipments. Role I join as an Electronics engineer in maintenance dept. of the plastic sheet division. During seven months period in plastic sheet division. Maintenance & repair of electrical & electronics equipments instruments. Repairing & Maint. of Programmable Logic Controller ( PLC ) Maintenance of various types of Process Instruments, Control Panel Systems, & Calibration of Instruments. To carry out the preventive maint. As per schedule. Part Time Lecturer A Full Academic Year 92-93 Govt. Polytechnic College, Jalgaon. Professional Training Undergone Two years course in Electrical (Vocational) conducted by Govt. Technical Board. Topics covered, repairing and maintenance of Electrical equipments. Two days residential programme on PINCH TECHNOLOGY AND PROCESS INTEGRATION Conducted by National Productivity Council, Chennai Five days In house training programme by Mr.Smitts (Manager Maintenance) of Wavin, Netherlands. About Injection Moulding Machines. Other Details: Repairs and maintenance of consumer Audio Equipments, Emergency light systems, Inverters & UPS Systems. Experience of LT Lines and Hydraulic System. Project Work: Digital frequency meter Seminar Delivered: Electronics Navigation Systems List of the Machinery Handled Under single Roof in Details:- Klockner WindsorSP 80 & SP 80DD - 03 Nos. Klockner Windsor SP 130 SP 130 DD - 07 Nos. Klockner Windsor SP 180 & SP 180 DD - 07 Nos. Klockner Windsor SP 300 & SP 300 DD - 09 Nos. Mafatlal Nigata NN 75- 01 Nos. Mafatlal Nigata NN 160- 03 Nos. Mafatlal Nigata NN 220- 04 Nos. Mafatlal Nigata NN 300- 02 Nos. Super Master SM 90 ? 01 Nos. Super Master SM150? 02 Nos. Super Master SM 180? 02 Nos. Super Master SM 250 ? 03 Nos. Super Master SM 350? 01 Nos. Super Master SM 550 ? 01 Nos. Super Master SM 450- 02 Nos. Sumitomo 550- 01 Nos. L.G. Machinery LGH 100- 05 Nos. Jet Master JM 168 - 01Nos. Jet Master JM 218 - 02 Nos. Jet Master JM 368 - 01 Nos. Sumo Smart SS 350 01 Nos. Sumo Smart SS 180 02 Nos. Sumo Smart SS 150 02 Nos Sumo Smart SS 260 01 Nos. Haitain HTF 350 X 01 Nos. Haitain HTF 300 X 02 Nos. Haitain HTF 250 X 04 Nos. Haitain HTF 200 X 28 Nos. Haitain HTF 160 X 15 Nos. Haitain HTF 380/470 X 02 Nos. Haitain HTF 470/530 X 01 Nos. Haitain HTF 600/700 X 01 Nos. Total Nos 118 Nos. List of the Utility Set Up for the above said Machines in Details:- 1) Diesel Generator set ? 750 KVA, 630 KVA, and 180 KVA 2) Air Compressors ELGI Make SCREW Compressors ? 03 Nos. 3) Air Compressors ELGI Make Reciprocating Compressors ? 04 Nos. 4) Pump House (Process, Cooling, & other Water pumps) 5) Mixers NEOPLAST Make -06 Nos. 6) Other Aux. machinery like Grinders, Cranes, Cooling Towers etc. Other Details are:- Total Connected load of the Plant ? 4800 KW Maximum Demand of the Plant ? 2000 KVA Transformers Used ? 2*1000 KVA Future Goals: To make a quality production on time at lowest possible cost and safely with good employee relationships by maintaining the Plant equipments and machines Healthy. ________________________________________________________________________________________