plastemartjobs.com Email: jobs@plastemart.com, hr@plastemart.com Download Date: 2/6/2025 9:25:45 AM ________________________________________________________________________________________ RefNo: CA - 6780 Gender: Male Age: 45 Designation: Executive Highest Education Level: Graduate - Degree Current Gross Salary: 400000 400000 /Annum Expected Gross Salary: 500000 500000 /Annum Preferred Location: Anywhere Notice Period: 30 Days Education Details: B.Tech. in Polymer Technology (2003) from College of Engineering and Technology Akola in first division with Polymer processing, structure & rehology as main subjects. Skill Sets: Production management Spearheading production activities involving working out Various requirements & monitoring overall project operations for ensuring timely completion. Monitoring and controlling of BOPP production line of 17000 TPA capacities. Coordinating projects for the set up standards with accountability for strategic utilization & deployment of available resources to achieve organizational objectives. Handling waste recycling system and micro planning of production based on equipment condition. Work Experience: 21.7 Work Experience Details: Assistant Manager Since Jan. 2010 Job profile: To manage a fully automated, BOPP Bruckner plant. Updating the Raw Material reconciliation and Input to Handover Ratio. Planning production on line in coordination with planning. Reporting to the GM (Tech) and VP. General and Preventive maintenance of plant and machinery, manpower handling, inventory control and housekeeping. To minimize wastage in process and also in slitting. Updating the jumbo stock and roll stocks. Plan and executive all plant Shut downs. Project: Worked in Erection and Commissioning of the Nahar group 1st line. Achievement: Stable 10/12 micron Plain film run on 8.7 mts line. Executive From May 2005 - Jan. 2010 Company Profile : BOPP film manufacturer with products as White Opaque, Pearluster, Label films, Tape, Metallizable films Job profile: To manage a fully automated, BOPP DMT plant including slitting of finished jumbos. Controlling and supervising all activities and reporting to DGM and the Line Manager. Daily updating the Raw Material reconciliation and Input to Handover Ratio. Taking decisions about process control by analyzing laboratory reports General and Preventive maintenance of plant and machinery, manpower handling, inventory control and housekeeping. To minimize wastage in process and also in slitting. Updating the jumbo stock and roll stocks. Plan and executive all plant Shut downs. Project: Achieved reduction in Oil consumption up to 4 L/month. Achievement: 0.55 density successful films run in 2009. Internal auditor for SA 8000 and ISO 9001 2008. Capable to run a fully automated, five layer BOPP line with products as White Opaque, Pearluster, Label films, Tape, Metallizable films. Production Engineer Feb 2005 - April 2005 Super Pack industries Nagpur Job profile: Achieve daily production targets as per planning. Maintain ISO quality standards set for polymer blends. Production Engineer From June 2003-Jan 2005 SJS Plastiblends Pvt. Ltd. Aurangabad. (Talc filled, Glass filled compounds and Master Batches.) Job profile: Production planning and implementation. Colour matching, recipe adjustments. Trouble shooting. Managed a new project as Project Engineer with collaboration with National/Panasonic in washing machine gear box section for SJS. Industrial Training: National/ Panasonic: - SJS Sponsored training was organized for fifteen days in Panasonic, Ranjangoan Pune for their new venture of VSCPL-II Aurangabad. This included the online assembly, Interaction with all Departments like QA, PPC, Purchase and Stores etc for the new set up. Indorama Synthetics Ltd. Nagpur: Indorama Synthetics Nagpur produces Polyester yarn, Staple Fibre, Chips by Condensation Polymerization Technique. The training included the over view of the Plant. Project: Optimization of Processing Parameters in Steam Moulding Process of Expanded Polystyrene and Waste EPS (Thermacol) utilization. :- Future Goals: To become a Manager manufacturing in 5 years. ________________________________________________________________________________________