Ref. No. : CA - 35373 - (Maintenance and Service - Electrical – with 14 years in Plastic Industry)

Education

B.E.-Electronics & Communication [2010] with first division from Rajiv Gandhi Technical University.
I have completed class 12th from Madhya Pradesh board with First division in year 2006.
I have completed class 10th from Madhya Pradesh board with First division in year 2004.

Skill Sets

Honesty, Accountable, Sincere, Problem solving, Flexibility.
Experience in motivating and fostering team environment.
Good team player and have excellent interaction skill to coordinate and work within a team.
A Keen and Quick Learner, constantly working towards increasing knowledge base.

Work Experience

Assistant Manager
From -JUNE -2020 to till now
Company profile - The company manufactures Polyester (PET) and Polypropylene (OPP) films

Job profile -
At B C Jindal Group (JPFL) whole instrument related responsibility in poly plant Continuous polymerization
plant (Capacity-150tpd & Make-Polytex), Continuous polymerization (Cpacity-400TPD Aquafil Technology), Solid state polymerization (30TPD-DHP China & 200TPD-polymetrix), Batch Poly plant (170TPD), WCH, Coal fire heaters (CFH 1,2&3) and its utilitys (Oil fire heaters, chillers, Compressors, nitrogen Plant, Air
dryers).
Successfully done upgradation of Yokogawa DCS system from CS-3000 R3.0 (AFF50D) to Centum VP R6.08.06 (AFV30D).
Project management which includes Planning, Execution, Monitoring & Closure as per the committed
timelines considering the necessary QMS & regularity requirements.
Planning & Execution of different types of maintenance & trouble shooting of instruments / control
systems (PLC /DCS) and its accessories in co-ordination with OEM /Service provider
Yokogawa DCS CS 1000, CS 3000 & Centum VP programming, installation/un-installation of DCS software,
troubleshooting, maintenance, Trend creation, software backup upload/download, logic Development/
modification & Configuration of Analog input/Analog output/Digital input/Digital output tag with its graphics
development.
Uploading and downloading of backup and Graphics modification in Siemens PCS-7.
Uploading and downloading of Siemens PLC (S7-200/300/400/1200/1500) program through Micro-win,
Simatic manager & TIA Portal.
Uploading/downloading parameter back-up & troubleshooting of Siemens Inverter (MM430/MM440/G-
120/Sinamics DCM-6RA80 DC Drive) thru starter, Scout & Drive monitor.
Uploading/downloading of Parameter back-up & troubleshooting in Danfoss inverter thru MCT10 (Motion
Control tool).
Job planning & job distribution, day to day preventive maintenance planning, shut down job planning, budget
preparation, maintaining ISO related document, Material / spare management, SAP/SAP HANA.

Assistant Manager
From - OCT 2019 to JUNE 2020
Company profile -the leading cement manufacturers & marketers

JOb profile -
At ACL Working as Assistant Manager- Instrumentation (HOD), whole responsibility related to instrument
department of 12MW Power plant {AFBC Boiler capacity - 52TPH, Boiler make - Cheema, Turbine makeTriveni, and Alternator-TDPS}, Ash handling system, WTP & coal handling plant. Also assist to DGM
Instrument of Cement plant in cement plant instrumentation problem.
Attending breakdown in boiler, turbine, AVR, Coal handling unit & Ash handling system & synchronizing
with grid (Using AGC panel & manual system also), boiler and turbine interlock, wood word governor,
motorized valve (Auma/Rotork), Drive & compressor (Atlas Copco).
Job distribution, Job planning, preventive and predictive maintenance planning, shut down job planning,
budget preparation, Material / spare management thru SAP, new project development.

Senior Engineer
From -March 2017 to SEP-2019
Jindal Poly Films Limited

Engineer
September 2010 to February 2017
Vandana Global Limited

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com