B.E (Mechanical): -BE from IME University
Diploma: - Diploma in Plastic Mold Technology from CIPET,
Academic Qualifications from T.P.S College Chapra (Bihar) Session 2002
Matriculation: - B.S.E.B. (PATNA) session 2001
Tooling Engineer with over 12 years of experience in, Mold development, Mold maintenance, Design review, Customer support, technical support engineer.
Hand on experience in Tool & Die maintenance, Vendor Development, Troubleshooting Tool validation, Part validation, AUTO CAD, UGNX, CATIA V5, Technical support engineer, Rectification and Modification machine and tool.
Expertise in Tool maintenance & Tool development, technical support between customers, Strong analytical skill, planning, resource utilization of procurement & manpower.
Assistant Manager
From 1th Aug 2016 to till date
Company profile- market leader in adhesive, industrial and construction chemicals, and art material
Job profile-
Interaction with the Industrial Design dept & Product design Dept in relation with part DFM & Tool DFM, modification activities
Responsible to attained the trial at vendor place and coordination
Rectification and modification management
Assisting vendors in trial and production processes and providing them suggestions for improving process efficiency and quality improvement
Coordinate with customer for sample submission, modification and approvals.
On field Inspection & dispatch inspection of the tools
Prepare comprehensive project plan and monitoring of Part / Tools Manufacturing at vendor
New Product Design Review with product design team & review Tooling Feasibilities.
Mold design review & Co-relate with Standards,
Handling suppler and co-ordination for project completion as per schedule.
Co-ordination for Part Approval, Mould Trouble Shooting & Fine Tuning, Mould Commissioning, Process Optimization
Production of new project (PMS) before handing over tools to production team.
Plans, procures and maintains molds & spare parts need to support production requirements.
Responsible for analyzing and solving the problem related mold, parts quality, machine and efficiency.
Root cause analysis of breakdown& permanent solution /design change to not repeating the same.
Implementing the system for preventive maintenance to eliminate the breakdown to tools.
Day to day interaction with vendors for trouble shooting.
All Documents updating, (History card, Load-Unload sheet, mold shift to other plant) induction &its documentation.
Ensuring mold performance as well as maintaining the best quality of product.
Develop and maintain strong relationship with internal and external stakeholder.
Identify, update and managing the spare of critical & non critical.
Implementation of Kai-Zen and improvement innovations.
Senior Customer Support Engineer.
From 25th July 2011 to till 25th July 2016.
Company profile-Systems that is provides total solutions with world class technologies
Job profile-
Systems Worked On
Water cap 16 cavity low weight with fully hot runner mould.
16 cavity Dabur 16/19/24 dia IMC mould with fully hot runner mould.
Spout cap 48 cavity with fully hot runner mould
Spout 48 cavity with semi hot runner mould.
50 dia standup cap 16 cavities with IMC fully hot runner mould.
Steiner ring 32 cavity fully hot runner mould.
40 Dia standup cap 24cavity fully hot runner mould.
CTC top cap & Bottom 16 cavity fully hot runner mould.
25 Dia Flip Top cap Full hot Runner mould.
24 Dia Flip Top cap Full hot Runner Mould.
24 Cavity MAK cap Full hot runner Mould.
Conditioner cap model and specifications 2 cavity mould.
Dash Board, LH RH, Front Bumper, Rear Bumper, Door Trim, etc.
Additional Roles Performed
HRS System installation at the customer end.
Full technical support in design and manufacturing at customer premises.
Injection molding machine parameter setting.
Assembly of multi cavity hot runner mould.
Assembly of Automotive moulds hot runner system
Tool Room Engineer
1 years
REXAM Healthcare
Key Responsibilities
One year experience with REXAM Healthcare India Pvt. as a Junior Engineer, heading the key departments like Tool Room, Vendor follow-up.
Preventive maintenance of Running molds.
Inspection of new molds.(Mold opening , Closing, Movement of Ejector system, Cooling Channel).
Conduct trial of new mold.
Mold Modification (Modification as per Customer requirement, Gate Location Modification).
Conduct Trial after Modification & Correction after Trial concern.
Ensure 100% Correction on Time.
Attending On Machine Break Down.
Documents Preparation as per ISO
Maintain 1s/2s at Working Area.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com