Ref. No. : CA - 10287 - (Production - Extrusion Pipes – with 13.7 years in Plastic Industry)

Education

PGD-PPT in Plastic Technology From Central Institute Of Plastics Engineering And Technology (CIPET), Chennai With First Class.
Graduation From A.S.D College, Tirtol, Utkal University With First Class
12th Standard From A.S.D College, Tirtol, C.H.S.E Board With First Class
10th Standard From S.A.P.S.K, Ganailo, State Board With First Class

Skill Sets

Packages:
Moldflow, CAD/ CAM using CATIA.
Platform Used:
Windows XP, 2000

Areas of Interest:
Research and development, New product development & Plastic materials.

Work Experience

Assistant Manager
From - 21 Dec 2020 TO Till Date
Company profile - MANUFACTURERS OF PVC TILES

Job Profile - UPVC COLUMN PIPE,THREADED CASING PIPE, PLUMBING PIPE,CPVC, RIGID PVC POTABLE WATER SUPPLY
PIPE,SOLVENT WELD UPVC PLUMBING PIPE,PP-R PIPE,HDPE PIPE.
To plan the various developments to ensure improve productivity and cost reduction.
To monitor &control the production process.
Monitoring & control on wastage generation.
To ensure that all machines are running on rated output.
Replace screw and barrel as per schedule

MANAGER (WEST AFRICA)
From - 05 July 2017 to 10th Dec 2020
Company name - MANUFACTURERS OF UPVC COLUMN PIPE,THREADED CASINGPIPE,PP-R PIPE,HDPE `

PRODUCTION AND QUALITY ENGINEER
From - 09 th Feb 2013 to 30 June 2017
Company Profile - MANUFACTURERS OF UPVC COLUMN PIPE,THREADED CASING PIPE

Graduate Engineer Trainee
From - 22 Aug 2011 to 17 Jan 2013
Company Profile: Manufactures a wide range of plastic components for the automotive and the non-automotive industry.
Job Profile:
To co-ordinate with OEM Customer (vw,ford,nissan).
To Prepare New Product Feasibility Report.
To Prepare Raw Material Spec Matches with supplier material & Cavitation and select the Machine for plastic Molded Part.
To Prepare All the secondary Operation (Machine, Material, Production, Paint, and Packing.

Future Goals

To pursue my career with the challenge of a demanding work environment and also to prioritize the workload under pressure capable of making significant contribution to the efficiency of the organization

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com