Mechanical Engineering
2D & 3D Modeling using AutoCAD Mechanical 2016 2
Solidworks Modeling
MS-Excel ,MS-Power point ,MS-Word
Assistant Production Manager
Since 16/08/2019 - Till Now
Company profile- engaged in Manufacturing and Exporting a wide range of Surface Protection Film, Surface Protection Tape
Job profile-
Assist Production Manager in planning, managing and executing production operations.
Coordinate and plan production priorities, workflow and schedule.
Identify and report operational and maintenance problems to prevent production delays.
Schedule routine inspection and maintenance of production equipment to prevent equipment break-downs and malfunctioning.
Develop or update standard operating procedures and best practices for production operations.
Ensure that all equipment, materials and supplies are readily and continuously available to carry out production processes.
Address employee concerns and complaints in professional manner.
Assist in interviewing, hiring and training new employees.
Manage performance review, appraisals, and promotions for employees.
Optimize production operations to meet quality and performance standards.
Assist in documenting all work instructions and procedures.
Ensure safety measures are procedures are followed to reduce unexpected incidents and hazards.
Ensure production process is carried out in accordance with company policies and procedures.
Determine resource requirements and work allocation for production operation.
Analyze overall budget and implement cost-optimization initiatives
Assistant Production Engineer
Since Nov 2017 to 08/07/2019
Company Profile: Engaged in Manufacturer of Plastic Packaging Items used in industries like FMCG/Food/ Pharma and electronics. We are already an IS 22000 : 2005 registered company.
Job Profile:
Plan, manage, and oversee all elements of production in our factory
Assess and analyze current production methods
Develop and draft an improved production process
Design and implement cost-reductive changes
Maximize productivity of machinery and workers
Follow product specifications and quality control measures.
Determine which machines, tools, equipment, etc. will be used and where they will be stationed in the facility.
Determine how many workers are needed to man the production.
line Train, supervise, and manage production line workers.
Increase speed and efficiency of processes without compromising quality.
Junior Engineer
Aug 2016 to Nov 2017
Company Profile : Manufacturer a wide range of high-quality BOPP Packaging tapes.
Job Profile :
Develop plans and calculations
Manage project workflow
Provide engineering support
Prepare project report
Coordinate team member
Achievements & Awards
Participated in Workshop on ROBO-RACE [WHEEL] at SIT Jaipur. Participated in Workshop on alternate energy resources. Participated in leadership training camp.
Industrial Exposure
Sail Project training On Charging System In Blast Furnace [Case Study BLT] [August 2015][4 weeks]
It allows nearly continuous charging of the BF. While the rotating chute is
distributing the contents of one lock hopper bin, the other can be filled.
It solves the problem of gas sealing under a high pressure operation.
It provides flexibility in the distribution of BF burden.
It can carry out one ring charging, multi ring charging, spiral charging, sector
charging andpoint charging both in manual and automatic mode.
Charge regulating valve provides accurate and constant distribution of burden
materials.
It provides improved BF operational stability and efficiency leading to better hot
metal chemistry control.
It contributes to increase in the BF productivity.
It reduces BF coke rate and helps in achieving higher injection rates of pulverized coal.
It contributes to higher campaign life due to reduced BF wall heat loads.
It greatly reduces the maintenance time and frequency of maintenance of top
equipment. The chute can be replaced within a short period of time.
The top equipment is of light and compact construction compared to other high pressure top
charging system.
Projects
Wind Turbine
6 Months
This project can be used for increase the effectiveness of a wind by using Circular Disk Concentrator. A Circular Disk shaped wind Concentrator having is most effective at reduced flow seoration and increasing velocity, Improving wind speed more than other analyzed cases.This project is used for the turbulence flow and low velocity region.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com