Ref. No. : CA - 35869 - (Maintenance and Service - Mechanical – with 11.4 years in Plastic Industry)

Education

GATE 2013 qualified.
Completed BE in Electrical & Electronics Engineering from V M U Salem, with aggregate of 82.3% of marks in 2011.
HSC from Bihar Board with 59% of marks in 2006.
10th from Bihar Board with 72% of marks in 2003.

Skill Sets

Have done 3 months of training for PLC & DRIVES from MAX Automation- New Delhi.
Organization : I.O.C.L , Barauni Refinery, Bihar
Area : Thermal Power Station, Electrical workshop
Duration : 1 month
HP soft skill : 50hrs

Work Experience

Asst Manager Electrical & Electronics
From - Oct 2021 to till now
Company Profile - manufactures folding cartons, printed blanks and outers, litho-lamination, plastic cartons, blister packs and shelf-ready packaging

Job Profile -
Installation & Commissioning of 5-layer Reifenhauser MDO blown film line, Extrusion lamination m/c, 10 Color Printing m/c, Slitting m/c etc.
Installation & commissioning of All related utilities, like Chiller, compressor, Transformer, RMU, Cooling tower, UPS etc.
Planning, supervising and execution of all maintenance activities.
Creating Vendors, Preparing Budget, Keep Minimum Spare stock etc.

Senior Engineer Electrical & Electronics Maintenance head
From - Oct 2020 to till Oct 2021
Company Profile - manufacturers of synthetic ropes Flexible Film, Agricultural Film, Shrink Film,Yogurt Packing Film, Juice Packing Film, Water pouches,Shopping Bags,HDPE Ropes.

Job Profile - Maintain record of Daily Maintenance work, analysis of repetitive Breakdown & its remedies.
Responsible to Reduce downtime of machine & MTTR, Improve OEE, MTBF.
Successfully modified the Kabra 3 layer machine old system. Installed new air ring profile control, Circular thickness gauge, automatic dosing gravimetric system (Make-Syncro) for better quality & for lower thickness.
Successfully modified the Windsor 3 layer machine old system. Installed new air ring profile control, Lay flat thickness gauge, automatic dosing gravimetric system (Make-Syncro) for better quality & for lower thickness.
All planning done for new Macchi BFL 5 Layer (Auto width & thickness control, IBC, OBC, 1000 kg/hr output).
Conducting the preventive maintenance and breakdown maintenance of Machines as per the schedule in time.
Proper scheduling and Utilization of manpower and material to breakdown in order to reduce breakdown time and material expenses.
Planning, supervising and execution of different maintenance activities.
To prepare budget & maintain a demand of all required electrical material and quantity of material.
Implementation of Report of Daily, Monthly, Yearly as Per Schedule & Responsible.
To maintain documentations and Quality records as per ISO.
Handling Engg store, Vendor development with cost and quality effectiveness, Spare part management & coordination with Electricity offices.
Successfully introduced KAIZEN culture, 5S activity, 3M elimination & TPM.

Senior officer Maintenance
From - July 2018 to October 2020
Company - Ultimate Flexipack

Job Profile -
Successfully installed 2 nos New 7 Layer Reifenhauser Blown film line (auto width & thickness control, IBC, OBC, 750kg/hr output), 1600MT silo system with hopper loader for granules storage.
Maintain record of Daily Maintenance work, analysis of repetitive Breakdown & its remedies.
Conducting the preventive maintenance and breakdown maintenance of Machines as per the schedule in time.
Proper scheduling and Utilization of manpower and material to breakdown in order to reduce breakdown time and material expenses.
Implementation of Report of Daily, Monthly, Yearly as Per Schedule & Responsible.
To maintain documentations and Quality records as per ISO.
Handling Engg store, Vendor development with cost and quality effectiveness, Spare part management & coordination with Electricity offices.

Senior Executive - Maintenance
From - March 2017 to June 2018
Company - Kris Flexipacks pvt Ltd Daman

Sr. Executive Engineer
From - Aug 2011 to Dec 2016
Company -Parth Foils Pvt Ltd, Silvassa, D&NH

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com