Bachelor of Electrical Engg. (Regular-PTDC) Institute- Madhav Institute of Technology & Science, Gwalior (M.P.) Percentage- 63%
Diploma in Electrical Engg. (2005) Institute- Dr. B.R. Ambedkar Polytechnic College Gwalior (M.P.) Percentage-78 %
Devlopment of SPM based on Hot Stacking Process.
Development of some POKA-YOKE systems.
Participate & get award in Intergroup Quality Circle Contest.
Modification in HT source side that gives a Huge cost saving to the Company.
Design the PLC program and convert the manual system into automatic system.
Asst. Manager
From - NOV. 2012 to till date
Company profile -Manufacturer of fmi compressor, fmi condensers & fmi evaporators
Job profile -
In utility taking care of 1500KVA Transformers, HT/LT Air washers, RO plant and Air-compressors, Crane 10T & 5T.
Programming and modification in Mitsubishi PLC (Q ,FX and A series).
Preventive and breakdown maintenance of Fanuc robot weld 120IB, 120IC and Panasonic roboweld TA1600, TA1400 etc.
Machine maintenance includes SPM machines with Mitsubishi PLC automation.
Maintenance of Aida 200Ton press,300 ton pres and 150 ton press with PLC automation.
Preparing of New PLC Program as per required application, worked with GX developer & GT Designer.
Engineer
From - JUNE 2010 to OCT-2012
Company profile - mold manufacturing for automotive plastic injection molding parts
Job profile -
Working as a shift Engineer in all three Shifts.
Operation and maint. of Transformers, OLTC, HT/LT Panels, Air washers, RO plant and Air-compressors
Preventive & Breakdown Maintenance of Injection Molding Machine up to 3150 Ton.
Commissioning of New Machines including Panel and cable laying work.
Jr. Engineer
From -Feb 2008 To May 2010
M/s Krishna Maruti Ltd.
Jr. Engineer
Apr 2006 To Jan 2008
M/s Supreme Ind. Ltd
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com