Ref. No. : CA - 28593 - (Designer & Product Developer – with 19.3 years in Plastic Industry)

Education

B.E in Production Engineering.M.H. Saboo Siddik College of Engineering (Mumbai University) in 2000 with 56%

Diploma in Production Engineering.Bhausaheb Vertak Polytechnic (M.S.B.T.E Board) Vasai in 1996 with 69%

S.S.C Gokhale High School (Maharashtra State Board) Mumbai in 1992 with 72%

Skill Sets

Operating System: Windows 8, MS-Office for routine work.

CAD/CAM Software: Auto-CAD Mechanical 2017, Solid Works 2018, Ansys-15, Solid Edge.

Work Experience

Design & Drafting Engineer.
Jan 2016 to April 2019
Job Profile :
Worked as a design and detailing engineer for the water park slides and its mechanical equipment.
Design of the support steel structure for the FRP water slides as per standard material specification.
Preparation of production drawing, BOM and ERP entry for the production planning and control department.
Layouts to fit equipment’s as per customer architectural drawing by using auto cad software.
Preparation of plumbing drawing and selection of pumps after finalization of layouts.
Used solid work software for the product and component development, simulation and motion analysis. Walk through animation for presentation purpose and to assist marketing and graphic design department.

Assistant Design Engineer.
Nov 2010 to Aug 2015
Job Profile :
Worked as a design and detailing engineer with research and development team for the product development, improvements in design, resolve quality related issues.
Worked on the product of mechanical, hydraulic, pneumatic and electric driven bolt tightening tools and its accessories.
Handle development project and making of prototypes for the hydraulic power pack system, hydraulic cylinders and pneumatically operated epicyclical planetary gear boxes as per the customer specific torque and tonnage requirement.
Involvement with the production, assembly department and the vendors to make the product prototypes.
Used Solid works and Auto-cad software for the part and assembly modeling, BOM, machining drawing with GD & T tolerances, simulation, IGS format for NC programming & wire cut machining.

Design, Detailing Engineer.
Sep 2006 to Nov 2010
Company Name : World Engineering Services Pvt Ltd.
Job Profile :
Preparation fundamental gear box assembly design and GA drawing for the client X-tek (USA.)
Preparation of precise machining, fabrication, casting, assembly drawing & bill of material.
Pleasure boat equipment’s reverse engineering, conversion of 2D to 3D drawings, modeling and detailing for the client Vetus (Holland).
Modeling parts, assembling and drafting using Auto Cad, Creo and Solid works software.
Project Handle: Gear box design, Reverse engineering of propeller shaft gear box.

Design & Development Engineer
Oct 2004 to Aug 2005
Company Name : Gotey Automation Pvt Ltd.
Job Profile :
Carry out reverse engineering & conceptual design using software’s like Solid Edge, Auto-Cad.
Process planning, controlling & co-coordinating tool room activity, coordination and follow up
With vendors.
Design & detailing of following special purpose machines.
Special purpose hydraulic & pneumatic presses with tooling i.e. bearing pressing, oil seal
Pressing. Pneumatic & hydraulic clamping fixtures. Automated location & clamping fixtures.
Multi spindle drilling & reaming machine

Assembly Production Engineer And Assistant To Industrial Engineer: Sep 2003 to Sep 2004.
Graduate Trainee Engineer: April 2002 to April 2003
Company Name : Mahindra & Mahindra Ltd.
Job Profile :
Worked in Axle and Gear box transmission manufacturing engineering department.
Machine tooling design and drafting with application of GD & T parameters & application.
Design of jigs, fixture & gauges on (I-DEAS 2D & 3D).
Improvement in manufacturing process to reduce rework costs, process cost.
Assist to Industrial Engineer for development of 5 speed gear box project.
To make layout of shop floor and assembly line balancing with work study.
Material handling equipment like conveyors, trolley, lifting system.
Involve to setup automated assembly line conveyor system
Implementation of POKA-YOKE mistake proofing system in assembly line.
Involvement in implementation 5s, TPM, SOP.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com