Ref. No. : CA - 12913 - (Maintenance and Service - Electrical – with 13.2 years in Plastic Industry)

Education

B.Tech in Electrical & Electronics Engineering from United Institute of Technology, Allahabad, Uttar Pradesh with 1st Class in 2007 to 20011
MBA in Operations Management from Sikkim Manipal University.
Intermediate from St John’s School, D.L.W,Varanasi.(I. .S. C)
Secondary Education from St John’s School D.L.W, Varanasi.(I.C.S.E).

Skill Sets

• Maintenance of Drives, on weekly basis

Organization ULTIMATE FLEXIPACK LTD.HARIDWAR.

Status PROJECT ENGINEER.(Errection & Commissioning)
Errection of Structures (6 Line upto 23mtr height)
Commissioning & Installations of
1. Blown film(Extrution) 6Line
2. Windmoller&Holsher(181,141,850kg/hr)(Germany)
3. Refenhausher(181,141,850kg/hr)(Germeny),
4. Mamta Brampton engg(181,700kg/hr(Canada)
5. EREMA Recycling(POLY) (3line 150kg/hr )(Austria),
6. Metallizer(Applied machines leybolt 2800mm width)

Work Experience

Maintenance- Electrical And Electronics
Sept. 2011 to Till Date.
Company Profile : An integrated infrastructure spread expertise spans the entire spectrum of flexible packaging applications. With the entire range of packaging related competencies under one roof.
Job Responsibility :
Maintenance of Drives, on weekly basis
Working on PLC And drives like ‘Baldor, Siemens, Hittachi, Control Technique KEB, ABB..
Maintenance of Three layer and nine layer blown film machines, like MBE, W&H, Reifnhauser,
Maintenance of Lamination, Slitting, Rls, Rewinder Machines.
Monitored equipment utilization and machine downtime with responsibility for the implementation of corrective and preventative actions.
Assisted the technical and non-technical staff with equipment utilization and maintenance.
Monitored machine utilization and providing detailed bi-monthly reports on machine downtime.
Manpower planning, scheduling and handling.
Maintenance of Screw type chillers,Air compressors (250 CFM), Cooling towers (300TR), Euro chillers (17TR).
Maintenance of the machines which are present in blown film SECTION.
Managing man power and scheduling the man power and work planning.

Project Engineer.(Errection & Commissioning)
Ultimate Flexipack Ltd.
Job Profile :
Errection of Structures (6 Line upto 23mtr height) Commissioning & Installations of Blown film (Extrution) 6Line
Windmoller&Holsher (181, 141, 850 kg / hr) (Germany)
Refenhausher (181,141, 850 kg / hr) (Germeny),
Mamta Brampton engineering (181, 700 kg / hr (Canada)
EREMA Recycling (POLY) (3line 150 kg / hr ) (Austria),
Metallizer(Applied machines leybolt 2800 mm width)
Colling towers ,Chillers (3line 225 TR), Compressors (3Line 250 cfm).

Project Underprocess :
Granual Conveying system (SILO) CAPACITY 2000 tone directly to machine.(on line transfer granules)
Blown film 9 Layer Extruder line capacity 500 kg / hr - completed, Metalizer(2850 mm width, Topmet (Applied Machine Germany)


Future Goals

To be a part of an organization where I can utilize my existing skills and get a chance to continuously learn and excel in my technical abilities and contribute to the growth of the organization

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com