Ref. No. : CA - 14287 - (Maintenance and Service - Electrical – with 13.3 years in Plastic Industry)

Education

Diploma - Electrical Engineering from Jodhpur University, Rajasthan in 2011

10+2 passed with math & sinces from Rajasthan Board in 2008 with 50%

10th Passed Secondary from Rajasthan Board in 2006 with 70%

Skill Sets

Expertise in enhance the process operations for optimising resources & capacity utilisation thus escalating productivity & operational efficiencies.
Target & achievement oriented with ability to take up challenges & perform in changing work environments.
Possess vast experience in Electrical & Hydraulics Maintenance Section.
Have faith to Work in Standardized/Prevailed Working Environment.
Ability to customize as per the prevailing working culture with faith in team Work and to work with politeness.
Attributes include aggressive in learning and in its implementation, self motivated and keen interest in new developments in my own field.
Effective communicator with the ability to interact with people at all levels.
Core competencies gathered from experience include

Work Experience

Machine & Utility Maintenance Engineer
Since June 2012
Company Profile: A leading manufacturer of Plastic Auto Components Injection Moulded, Painting, Assembly Parts and Tools. Custoomers include Hero Motors & Maruti Suzuki
Key Functional Areas
Daily machine maintenance plan and provide feedback to Maintenance Manager.
Plan the monthly preventive maintenance plan according to first or one months distance last pm date.
Carry out preventive maintenance and attain all electrical break-down of machine and other equipments maintenance of machine monthly, half yearly, yearly plan mention.
Responsible for the major breakdown handling.
Implement the 5’s on shop floor and identify area for improvement.
Responsible for the spear part.
Implement Kaizen improvement initiatives.
Manage injection moulding machine assembly.
Preventive maintenance DG Sets 1110 KVA, 1250KVA, Make - (Cummins).
Preventive maintenance for air Compressor 600 cfm. Make - (Kaiser & Atlas Copco)
Preventive maintenance for Crane 2. ton to 8 ton.
Acheivements:
Achieved reduction in machine repair cost
Improved standardized activities and processes, to eliminate unwanted activities through Kaizen and 5S.
Expert in handling of Major Breakdowns.
Familiraity With Machines
Moulding Shop
Injection Moulding Machine 110 ton to 775 ton - Make (Ferromatik)
Injection Moulding Machine 350 ton to 650 ton - Make (L&T).
Knowledge of Hot Sealing
Gathered experience of Maintenance in Injection moulding machine. MTC, HRTC, Crane, Grinder, Chiller, Pump House, DG Sets, etc.
Good experience in the field of Mould Hot Runner System.
Knowledge of yodo Robot teaching modify.
Other Activity
Maintain spares for service equipments & machines.
Run predictive & preventive maintenance schedules.
Reduce in Maintenance Consumables.
Trouble shoot control panel issues.
Maintain machine history card.
Implement Energy Conservation Projects in the area of Electricity and Fuel.
Manufacture of Machines In-House / Low Cost Automation as required by process.
Handle the Electrical Supply system i.e. HT and LT side.
Supervise the function of electrician and helper.
Plan and arrange the spare parts required for rectification of electrical break-down.
Ensure and confirm all the machines in the shift are operational.
Ensure the electrical safety norms are adhered to by the workmen in the shift.
Ensure respective log-book is properly filled and signed by the respective electrician

Future Goals

Electrical Maintenance

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com