ITI (Tractor Mechanic) From (Shirdi Shree Sai Baba Tech .Institute) Tal- Kopargaon, Dist –Ahamadnagar (M.S.) July 1985
HSC From Rao Bahadur Narayanrao Boravake College Shrirampur. Dist : Ahamadnagar (M.S.) March 1983
SSC From New English School Karegaon Tal: Shrirampur Dist : Ahamadnagar (M.S.) March 1981
16 years hand experience in maintenance field.
Engineer Maintenance .
Since June 2004
Reporting to: - Plant Manager
Company Profile: Leading manufacturer of PP, ABS, GP/HIPS, TALK PP, PPUV, PMMA/ABS, PET Sheet; Thickness from 1 MM to 6 MM and width up to 1300 MM
Job profile:-
Responsible for break down and preventive maintenance of sheet plant,
Having Main extruder and co extruder Gear box, Barrel and Screw cooling system, Screen Changer (Hydraulic and Manual), Melt pump (Maag make) and its accessories, Die (Width 1400 mm and 800 mm, coat hanger type with chocker bar and without chocker bar) and its lips, Multi layer co extrusion feed block, 45° inclined three roll stack (Hard chrome plated roll of 400 mm diameter x 1400 mm length) its Gear box, Hydraulic Power pack system and Heat Cool unit system, Pneumatic operated pull roll system, Hydraulic operated Sheet length cutter(Neugen make). Material loading system. Responsible for break down and preventive maintenance of film coating plant. Having Unwinder and Rewinder assembly, Coating head assembly, (Mayer bar, Doctor Blade and Air knife coating system), Oven (2 mts x 12 mts) it’s high CFM blower and hot air circulation system, Web linear system, Laminator. Responsible for break down and preventive maintenance of all utilities. Solvent filtration and circulation system, D M water plant system, Dehumidifier Regeneration system, Chiller, Air compressor, Cooling Tower. Vacuum Pump, Oil Pump, Sheet Grinder, Slitting machine. Involved in Erection and commissioning of sheet and film plant,
Involved in all type of modification work. Involved in Implementation of down time reduction. Maintaining all Records as per ISO 9000. 2000.
MIS reporting and Man power handling.
Acquired Knowledge about production and work as production Engineer on demand.
Forman
Aug. 2002 to April 2004
SJS Plastiblends Pvt Ltd. Aurangabad
Reporting to: - Plant Manager
In SJS unit 1 having Compounding & Master batch plants and APL plant.
(Automated palletizing line)
Job profile:-
Responsible for Over All Maintenance of Compounding & Master Batch
Plant. Having Multi Stage Twin Gear Box. Twin Screw, Twin Screw
Block Barrel, Water & Oil Base Heat Exchanger. Side Feeder, Twin Screw Lump Dozer, palletisor, Die, Water Trub, Scrubber, High Speed Mixture, Banbury Mixers (30 Ltr & 100 Ltr Cap) Vibretar, Die Face cutter assembly, Separators, Conveyor Belt, Material Dozer, Mixing Vassals and Molding machine Maintenance. Utility: Responsible for Over All Maintenance of Cooling Tower, All Types Water Pump, Air Compressor, All Type of Vacuum Pump, Key Compressor, Dehumidifier Dryer, Regeneration Blower, Oil pump, Screw Conveyer, Lumps grinder. Involved in Erection and commissioning of palletizing plant, Involved in all type of modification work.
Involved in implementation of down time reduction MIS reporting and Man power handling.
Shift In charge. (Production)
From April 1998 to Aug. 2002
Vikram speciality Coating Pvt Ltd, Nagpur.
Reporting to: - Plant Manager
Having PET Film plant of (Francis Shaw)
Responsible for all activities in shift .Such as product quality, quantity and
Manpower handling.
Responsible for Breakdown & Preventive Maintenance in Shift.
Responsible for product quality and its targeted quantity.
Knowledge about PET. HIPS. ABS, PP material.
Maintaining all Records as per factory system.
Self Business
From June 1995 to March 1998
Doing Self Business work of taking the Contract of Erection and fabrication work with manpower.
Job profile:-
Contract work done with Hi-Tech Engineering Pune, Bikson Engineering Ahmadnagar, Garware Polyster Ltd. Aurangabad All Type of MS & SS Fabrication Work, Pipe Line Work, Boiler Maintenance. Boiler Tube & Quills Replacement Work. As Per IBR (Indian boiler rules) in Sugar Factory and Distilleries Plant. Erection Work in Paper & Chemical Factory. RBC Maintenance, Erection of German Make Dornear and Bruckner Film Line Erection & Maintenance contract of Chill roll, MDO, TDO, UK Make Atlas Slitting M/C, Winder, Bhoolar, All Type of Water Pump, Air Compressor and Vacuum Pump. Key Compressor, Dehumidifier Regeneration Blower, Oil pump, Bepex, Screw Conveyor, Dryer , Erima Make Pet Palletizing machine, Erection of All Types of Valves, NRV, & PRD Station. Erection and Maintenance of Grinders
Assembler
From July. 1988 to March .1995
Bajaj Auto Ltd, Aurangabad.
Two Wheeler &Three Wheeler Engine Assembly and Rectification Work.
To attain the mastery in the field of mechanical maintenance with advance technology.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com