Ref. No. : CA - 14618 - (Maintenance and Service - Mechanical – with 12.7 years in Plastic Industry)

Education

BE (Mechanical) from Nagarjuna University, in 2012 .

Intermediate from Narayana College, in 2008

SSC from St. Pauls English Medium High School, in 2006

Skill Sets

Mechanical Maintenance Engineer

Softwares: Autocad 2D & 3D, Product engineering (pro-E).

Work Experience

Mechanical Engineer
Since June 2012
Company Profile: Produers of Alloy Steel required by the Automotive Industry to meet the requirements of the auto ancillaries
Job Profile:
Maintenance of Steel Melting Shop equipment’s like Electric Arc Furnace 50T EASTERN METEC Make (E.B.T), Continuous Casting Machine (CCM), Fume Extracting System, LRF(50 T) Side Lance, Ferro feeding System (65- 100T/Hr. Capacity), Gas Mixing System, Pollution Control System, Pump-House, E.O.T. Crane (15T to 100T), Pig casting machine and, Compressors, Hydraulics, Pneumatic system maintenance.
Preventive Maintenance, Breakdown Maintenance, Shutdown Maintenance of Continuous Casting Machine (CCM), Arc equipments, Cranes, Pump House, Ladle Refining Furnace etc.
Development of new technologies for efficient working of existing equipment’s by way of small modifications.
Investigate equipment failures and difficulties to diagnose faulty operations and to make recommendations to maintenance.
Read and interpret blueprints, technical drawings and computer generated reports.
Organization of work force for day to day activities & for scheduled maintenance.
Arrangement of Spares which are required for the smooth operation of System.
Evaluated mechanical record of mechanical equipment on a regular basis and ensured that equipment’s were effectively.
Prepare schedule for project and procured necessary raw materials and man power too.
Indenting and planning of spares, coordinating with purchase department for procuring spares.
Executing the shift maintenance activities regularly to eliminate the machine downtime.
Preparing checklist for all equipment’s and executing preventive maintenance based on checklist as per PM schedule.
Responsible to coordinate, Day to Day activities with inter department for smooth running of plant.
Modified and conducting troubleshooting of Hydraulic circuits, pneumatic valves

Other Projects:
A very active involvement in Erection and commissioning of LIME PLANT (85 TPD).
A very active involvement in Erection and commissioning of Producer Gas Plant (3700 NM3/HR)
A very active involvement in Modification of Fume Extracting System, I D Fan.

Project:
Title: Flue gas heat recovery to increase boiler efficiency.
Environment: Agri Gold Biomass Power Plant
Role: To increase the Boiler efficiency

Industrial Exposure:
Industrial training at VISHAKAPATNAM STEEL PLANT in manufacturing process of coke, liquid steel,
Process of Blast Furnace.
Industrial training at AGRI GOLD BIOMASS POWER PLANT (8mw).

Area Of Intrest:
Strength Of Materials

Extra Curricular & Co-curricular Activities:
Active participation in the National Cadet Corps (NCC), ‘B’&‘C’ certificate’s appeared.
Active participation in Rifle Shooting and secured Silver medal, NCC.
Got 2nd prize in the event D-ZINER (Auto CAD) conducted in K.L University & 2d-drafting in V. R. Siddhartha Engineering College.













































































Future Goals

To seek a position to utilize my experience and skills in Planning, Erection, Commissioning and Maintenance of Mechanical system that offers professional growth while being resourceful, innovative and flexible.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com