Ref. No. : CA - 20964 - (Senior Admin and Projects – with 14.4 years in Plastic Industry)

Education

B.E. in Mechanical Engineering From MIT Aurangabad, with 65.46%

Diploma in Mechanical Engineering From Government Polythenic Aurangabad with 68%

Skill Sets

Overall 5  years  6 months of work experience in automotive  industries .
Hand on experience on hydraulic; pneumatic Good experience in machine shop maintenance -planned , preventive, predictive and breakdown maintenance with TPM standard. Support to the utility maintenance.

A self-motivated, hardworking, innovative & proactive person with excellent planning & organizational skills.
I am adopting and making workable action plans & implementing the same for achieving effective results. Effective leader and a useful member of any team effort.
Well-structured and comfortable functioning in a virtual environment, both independently and in team.
Excellent verbal and written communication skills and motivated to acclimate to new technologies.

Work Experience

Project Engineer - Electrical & Electronic Division
Since Dec 2014
Company Profile: Manufacturing The Inlet & Exhaust Valves Of Engine.
Job Profile:
Supervision of predictive, Preventive & Breakdowns maintenance of CNC center less grinding, CNC turning, CNC Seat grinding, CNC groove grinding,
having control of FANUC OI-MATE – TC,TD.
Also looking for supervision of predictive, Preventive & Breakdown Maintenance of PLC controlled SPM machine, Screw press, Plating plant and hardening, tempering furnaces.
Core Responsibility to increase the availability with minimum cost of machine by to prevent the repetitive failure, increase the life of failure parts and minimize the repair time.
Core responsibility of machine modification, In-house retrofitting of old machine
Also Coordinating & Facing TS16949, Internal & External Audits, TPM & 5’S Activities and Safety Practices Implementation.
Involved in Maintenance Budget Planning & Cost Consumption Analysis.
Involved in Inspection & Installations of New Machine Equipments, Machine Modifications.
Coordinator for Continuous Improvement to team by giving the technical training to all team members.
Analysis of monthly breakdown, why-why analysis, MTBF - MTTR calculation.

Achievements
Improved the Availability of forging Area Upsetters
Oil Filtration Unit is utilizing for Online Filtration Purpose in machine shop.
Implemented Condition Based Monitoring System & Reliability Centre Maintenance
Brought machine Uptime from 93% to 97%
In-house retrofitting of 5 machines in plant.

Senior Engineer 
Feb 2012 to Dec 2014
Company Profile : Manufacturing the inlet & Exhaust valves of Engine.
Job Profile : 
Maintenance and Troubleshooting of CNC, Extrusion, VMC, Up setters, Press, Friction Weld, CNC Centerless, Box type Furnace, Plating Plant, leak test machine, Induction Heating
Trouble shooting, Break down analysis, Root cause analysis, Stoppage monitoring of critical machines etc
Improving machine performance through pokayoke & design modifications if required
Responsible for installation, commissioning and trial of the machine at the customer end.
proper planning of man power utilization for three shifts and support them for any type of problem
Preparation of PM schedules, JH (TPM) schedules, history cards, why-why analysis, breakdown data monitoring etc.
Imparting training to operators of maintenance and production to improve the knowledge as well as to handle and maintain the machine

Achievements
Brought machine up time from 95% to 99%
In-house retrofitting of 2 machines in plant.
Preventing oil leakages in forging area
Oil Filtration Unit is utilizing for Online Filtration Purpose in machine shop.

Trainee Project Engineer (Engineer 1)
July 2010 to Feb 2012
Company Name : Videocon Industries Pvt. Ltd.
Company Profile : Manufacturing The Washing Machine & Fridge
Job Profile : 
Maintenance of all types of Injection molding machine of Toshiba, LG, JSW from 500 to 1600 tonns. 
Planning, executing routine jobs and scheduling of Preventive Maintenance
Execution of jobs in shut down and breakdown as per planning.
Preparing the preventive maintenance schedule for Equipment’s.
Follow up of PM Schedule for all equipment’s.
Condition monitoring of equipment as per schedule to reduce breakdown.
To investigate mechanical failures of unforeseen problem, Take immediate corrective action during system operational disturbance
To maintain necessary spare parts.
To supervise other Operators and General Laborer in support of the Plant's Maintenance.

Future Goals

Seeking a challenging and responsible position in a growth oriented organization that offers the opportunity to fully utilize my personal and analytical skills developed through education and experience.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com