Pursuing BE Mechanical
Diploma in Mechanical Engineer From Gov. Poly, MSBTE Board in 2006
S.S.C From Pune Board in 1995 with 59%
8 years experience automotive Interior, Exterior component design.
Familiar with CATIA-V5 Cad applications and methodologies.
Knowledge in creation of product concept for automotive plastic and sheet metal part.
BIW panel product design validation and VAVE.
Well versed with automotive product development process.
Experience in PLM, Teamcenter and Metaphase.
Knowledge of developing new design of Lighting, Centre console, Seat design
Familiar with GD&T, DFMEA and Manufacturing Process.
Creation of 3D model and detail drawing from customer inputs.
Concept design and prototyping for seating system, lighting system and centre console.
Study of draft analysis, tooling direction and packaging feasibility.
Interaction with product dev. team for implementation of new features
Attending design review meeting and communicating with customer.
Worked in Implementation material and cost reduction (IMCR) department
Project feedback with making presentation and communicate with cus
Design Engineer
Since May 2014
Company Profile: Leading design and manufacture vendor to major OEM suppliers, giving end-to-end solutions to automotive and manufacturing industry.
Assistant Design Engineer
Nov 2010 to April 2014
Company Profile: Provides Engineering And Design Consulting Services To Automotive, Aerospace, Defense, And Manufacturing Industries
Design Engineer
Jan 2010 to Oct 2010
Company Name: Terminal Technologies (I) Pvt. Ltd.
Junior Executive Design Engineer
Feb 2008 to Jun 2008
Company Name: Fleetguard Filters Pvt. Ltd.
Main projects:
Interior -Exterior Projects
Project: Rear Centre Console Project.
Input: A-surface, igs model.
Description: Concept Design, Modelling of Rear Centre console assy.
Duration: 8 month.
Role: Proposals wise child part design of Rear Centre console assy.Fascia
panel Design,Carrier Design, Seat switch Bezel Design, Armrest stowage bin design. Fascia mounting bracket. Study of draft analysis,tooling direction and packaging feasibility.
Project: X104_Front Seat Project.
Input: A-surface, igs model.
Description: Concept Design, prototyping of Front seat (Back rest, Base rest, Head rest, Fiber insert, foam design)
Duration : 8 month
Role: Concept creation. Check packaging study and design as per customer guideline. Make presentation of concept. Study of draft analysis, tooling direction and packaging feasibility.
Project
Design of lighting unit for TVS and Bajaj two wheelers.
Input: A-surface and IGES model.
Description: Concept Design, Modelling of side indicator (F&R), Head lamp, Tail lamp.
Duration: 6 month
Role: Responsibility of Concept Design, Modeling of lighting unit parts Study of draft analysis, tooling direction and packaging feasibility. Co-odinate with lighting technical team (Rinder Spain team) and Development department for lighting specification (Fresnel design details).
Other Project
Bolero refresh (IMCR) and Ssangyong Rexton (Korea) CKD Project.
Input: Existing vehicle 3D, 2D data.
Description: Bolero new revision vehicle IMCR Project (Implementation Material Cost Reduction) and New Rexton launching in India with AIRI norm.
Duration: 12month
Role: Worked on PLM, TCUA and Metaphase. New concept generation for
Bolero refresh project. Part numbering, ECN release, drawing release.
Reliability-Validation concern resolution. CMVR certification Support. Detail part design study to reduce the development, tool & manufacturing cost.
Interface study of part to be designed with surrounding environment.
Single axle to double axle project for existing DLSI vehicle.
Input: Existing vehicle 3D, 2D data.
Description: single axle to twice axle in rear side in existing DLSI vehicle. Use MTBL
25T truck’s axle, chassis, suspensions, engine in existing DLSI vehicle.
Duration: 8 month.
Role: F&R suspensions mounting brackets design and packaging study.AC Compressor mounting design. Engine pulley belt tensioner mounting and packaging study.Engine cradle design and packaging. Deep stick and oil hose assy. design and packaging
study.Alternator mounting design and packaging study.
Localization of Internal/External Dryer Project
Input: Existing physical component reverse engineering.
Description: 3D, 2D creation of External dryer with& without sensor and internal dryer.
Duration: 6 month
Role: 3D, 2D work with reverse engineering of all dryer and, tolerance stack up.
Coordinate with Europe Clint for project activity with time to time. Worked in PLM, TCUA and METAPHASE work environment.
Avanti racing car proto vehicle for ARAI test.
Input: Reverse engineering, bench marking, 2D, A-surface and IGES model.
Description: Concept Design, Modeling of several part and system for Awanti racing car project.
Duration: 6 month
Role: A-arm design (F&R-upper-lower).Brake hose routing design and packaging
study. Air filter connecting bush and mounting bracket design and packaging study. Pipe routing design form clutch paddle master pump to engine and packaging study.Co-Ordinate with production department and validation dept for product design and packaging issue.
Professional Qualification & Training
Training by Fleetguard Filters Pvt. Ltd. in Cummins India Ltd. on Engine Tear Down.
Following Training provided by Fleetguard Filters Pvt. Ltd.
GD&T.
Sheet metal & Plastic part design.
APQP, FMEA
Growth
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com