Ref. No. : CA - 27659 - (Production - Compounds & Masterbatch – with 9.8 years in Plastic Industry)

Education

Bachelor Technology From Government College of Engineering Kalahandi, Biju Pattnaik University of Technology, Bhawanipatna, Odisha in 2013 with 74%

10th From Karim City College, Jharkhand Academic Council, Jamshedpur, Jharkhand in 2008 with 60%

Skill Sets

Experience in the manufacturing and automobile industry. Excellent problem-solving and analytical abilities with superb attention to detail. Extensive knowledge of the manufacturing process and the development of equipment and production lines. conceptual skills with the motivational abilities to lead a team. Dedicated to producing the best work, following safety measures, and meeting and exceeding project requirements and standards.

Problem solving skills, Inventory management, Analytical skills, Relevant Technical Knowledge, Self motivated with a result driven approach,
Fabrication, Kaizen, 5s, RCA and 8D analysis, Team working skills

Word 2010, Excel 2010, Power Point 2010

Work Experience

Production Engineer
Since Jun 2015
Company Profile: Leading manufacturer of synthetic monofilament yarns. Varieties of polymers like PET, PA6, PA66, PBT, PP and TPE are processed and the yarn of sizes.
Job Profile:
Provide engineering support for production and maintenance activities to ensure maximum production.
Perform engineering analysis to reduce downtime and outages.
Reduced changeover time by 50%+ by building and storing "changeover carts" that contained all tools and change parts at the point of use.
Improved OEE by 10% or greater per line
Identify unsafe operations and practices and report the same to the manager immediately.
Investigate problems, analyze root causes and derive resolutions.
Develop best practices to improve production capacity, quality, and reliability
Prepared the manufacturing department for the successful initial ISO-9001 certification with a strong focus on product change implementation.

Service Engineer
August 2013 to March 2014
Job profile :
Periodical maintain service.
Trouble shooting.
Supervising repair and replacement.
Register the warranty of failure parts on the portal.

Project Details
Project Topic : Water cooler cum water Heater using Refrigeration System
Institute: Government College of Engineering, Kalahandi.
Duration : 6 Months
Brief Description : The heat rejected in a normal refrigeration system is utilized for Water heating purpose in this system, thus making a saving in energy Consumption. It acts on the principle of energy conversion.

Future Goals

Growth

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com