Ref. No. : CA - 14285 - (Production - Dies & Tools – with 15.3 years in Plastic Industry)

Education

Post Diploma in Plastic Mould Technology (PD PMT) from CIPET, Bhopal in July 09.

Skill Sets

Understanding Business requirements and translate that to technical solutions.
Interpersonal, people and resource management skills.
Resolving the issues and problems online or making the decision along with concern department to resolve them at the originating time

Work Experience

Tool Room Engineer
Since Oct 2012
Company Profile: An ISO 9001: 2000 certified company. The company primarily deals in manufacturing and distribution of Electronic Energy Meters, Power Distribution Management Projects, Hybrid microcircuits, Inverters, Batteries, Home UPS and Online UPS. The companys tool room rivals the worlds best, with advanced CAD / CAM software, CNC machines and 14 injection moulding machines. The following manufacturing processes are carried out in house
Tooling
Injection Moulding
Centre for Design & Development (C - D&D)
Job Profile:
Manufacturing of new moulds along with team members.
Leading Die Maintenance Group along with team of 9 members to reduce maintenance leadtime.
Modification in moulds as per R&D requirements.
Interacting with customers or vendors and perform work related to modification, convertion on various projects running for production.
Performing point KAIZEN in shop floor and other surrounding area.
Manufacturing of Jig And Fixtures for production line and for other departments for easy flow work and to increase productivity and target achievement.
Preparation of Process Plan, Process Sheet and Control plans.
Maintaining of Daily performance report of work allotted and maintaining of history cards and other process planning sheets for new moulds and mould maintenance.
Operational training to team members for easy work output and resolving issues independently.
Being a part of breakthrough KAIZEN team.
Conversions of mould as per production plan online in target time.
Spare part management to avoid leadtime in mould maintenance and conversion of moulds.
Planning for preventive maintenance as per scheduled timing.
Planning for offloading work at vendor end and interacting with concern to meet target.
Working for KRA achievement and OEE (overall effective efficiency).
Performing OJT (on job training) to trainees and new joinees.

Tool Room Engineer
Sep 2011 to March 2012
Company Profile: Manufacturer of Buckets, Mugs & Storage Bins, Plastic Bucket, Mug, Tub & Dustbin

Assistant Engineer
Sep 2010 to Oct 2011
Company Name: Time Technoplast Limited

Training In Tool Room In Mould Manufacturing
4 Months
Company Name: Tooling Motherson India Ltd.

Project Undertaken (Major)
Project: Inverter Bezzel
Environment: Tool Room
Role Description: Process planning and development of new mould.
Project Description: Inverter is Electronic equipment, which contains number of parts including single parts, sub-assemblies and main assembly. It consist of metal as well as plastic parts, where angle frame is the main part which is covered by metal top cover from top and by plastic front panel from front side. The Front Panel is good looking having some surface modeling feature. This inverter is used for domestic purposes like tube light, fan, TV, etc.

Project: Single Phase Electronic Meter
Environment: Tool Room
Role Description: New Moulds For M. Top And M. Base
Project Description: This is a small model of single phase electronic meter. Top cover is transparent with two numbers of sealing screws along with having self lock arrangement in base. Name plate is self locked in base and terminal block. Terminal block is fixed in base and terminal cover is fitted in terminal block and having a base part called as m.base consists of pcb mounting and different connectors.

Project: Din-Rail electronic meter
Environnent: Tool Room.
Role Description: New development.
Project Description: Din rail meter was a samll meter working along with 12 similar meters perfoming different task at a high level and giving an extraordinary output in less duration of time. it consists of a top cover, a base and two sealing cover at it both ends.

Technical Skill Set
AutoCad

Future Goals

Seeking a challenging job to pursue my career and achieve a high level proficiency and professionalism with the fast moving organization and to endure myself with the company expectation and beyond.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com