B.E.(Electronics) from Suresh Deshmukh College Of Engineering, Wardha, RTMNU, Nagpur in 2012
with First Class
Diploma (Electrical Power System) from V.P.M’S Polytechnic, Thane MSBTE In 2009 with First class
10th Nutan Dyan Mandir, Kalyan Maharashtra State Board in 2006 with First Class
Well-developed and effective communication and organizational skills.
Hard worker and Ready to accept challenges.
Effective human relations and team work skills.
Computer Knowledge
Microsoft Office XP, Excel, PowerPoint, MS Word, etc. with all operating systems.
Circuit designing software: Multisim, MATLAB.
Production Engineer
Since November 2012
Company Profile: One of the leading manufacturers of broad range of Wiring Harnesses, Battery Cables and Wiring Sets. Provides connective solutions to each vertical of the automotive world and off Road Vehicles.
Clients: Mahindra & Mahindra Pvt. Ltd, Tata motors Ltd, Baja Two wheelers & Reliance Genset
Career Accomplishments:
Working as a Production Engineer with the management in coordinating and planning production activities to improve runtime plans.
Proven ability to manage complex manufacturing environments and multiple manufacturing projects in varying stages of production life cycle.
Exceptional track record of process improvement and the ability to meet critical schedule milestones.
Adhere to company standards and production policies to meet company objectives and standards.
Maintaining the high quality standard for the products supplied.
Strength:-
Manpower Handling, Total Productive Manufacturing, Resource Planning, Taking Calculating Risks. Problem solving.
Responsibilities
Setting production target.
Achieving monthly production indent.
Controlling line rejection and rework to improve productivity.
Implementing M.S.E.S.(Mahindra Supplier Evolution Standard) activity on shop floor
Introducing new motivation programs.
Proper Handling and follow the 5’s on shopfloor, start up, set up, abnormal conditions, 4M change management.
Responsible to conduct Daily work management (DWM) meeting.
Responsible for work order release and work in process (WIP) status for materials.
Maintain inventory of materials and supplies necessary to meet production demands.
Industrial Project:
To maintain FIFO System in material consumption at production stage.
Reduction of material inventory in industry.
Implementation of single piece flow on 7-pole assy. To decrease line rejection ppm and increase productivity.
I am completed the training MCQE (Mahindra Certified Quality Engineer)
Projects:
Mega Project (BE Final year): “Intelligent Load Shedding System Using Microcontroller”.
Description: Suppose actual supply of power from power station and it is distributed and if there is increased in load and decreased in supply of power at this position the production of industry is effected at great extent. So to help save electricity we are making an attempt by introducing our project. This system is widely using in Banks, ATM’s, computer labs, Hospitals, industrial area, etc.
Mega Project (Diploma Final Year): “Wind Energy Applicable On Cargo Ship.”
Mini Project (BE 3rd Year): “P-N junction Diode.”
Description: The ICs use for all electronic work is runs on very low voltage. In this project we use the resister, capacitor. In this project “P-N junction Diode” we have seen forward and reverse characteristics. The project use in all small electronics circuits and microcontroller assembly.
HOBBIES:
Travelling, Photography, Playing games, Listening music, Net surfing, Dance.
Looking for an excellent opportunity where I can work as engineering executive with my excellent executive skills to improve company strategy.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com