Ref. No. : CA - 11843 - (Production - Moulding – with 14.3 years in Plastic Industry)

Education

Diploma in Plastic Technology from P.S.B.T.E, Punjab in 2011.
12th from Himachal Pradesh School Education Board in 2006.
10th from Himachal Pradesh School Education Board in 2004.

Skill Sets

Proactively identify areas of obstruction / breakdowns and take steps to rectify the equipment’s through application of trouble shooting tools.
Coordinating with the maintenance deptt. To minimize machine down time & improve utilization of equipment’s.
Handling moulding plans/schedules for reducing machinery downtime to minimum and managing waste / discharges as per norms.
Abilities in managing moulding operations of equipment’s machines with knowledge of reducing downtime and enhancing operational efficiencies of the same.
A keen planner with excellent people management qualities.
Possess excellent relationship management, analytical & communication skills.

Microsoft Packages: Word, Excel, PowerPoint.

Work Experience

Engineer-Moulding
Since Mar 2012
Company Profile: Leader in development and manufacture of removable data storage media.
Job Profile:
Working as moulding shift in charge
Preparing and implementing action plans effectively to maximize overall equipment efficiency of production machines
Simultaneously working towards productivity and quality improvement through Kaizen activities.
Utilization of manpower accurately
Planning day to day production to achieve maximum production.
Analysis of daily tool consumption and generation of production reports.
Teaching of two axis robotic arms controlled by servo drives.

Junior Engineer – Moulding
May ’2011 to Feb. 2012
Company Profile: Manufacture Product Likes Juicer Mixer Grinder Philips Iron Toaster, Bar Blander, And Switch Component-Eveready Torches.
Job Profile:
High speed, PLC based machines, based on German, Swiss & Japanese technology.
CDR, CDROM manufacturing machine make by Steag Hamatech, Germany which includes pneumatic and electrical high speed robotic arms & machine.
Fault finding and troubleshooting.
To maintain 5’S in shop floor & Active member of TPM implementation team
Make Preventive Maintenance schedules of Moulding Machine.

Domain Knowledge
AMW Mould’s of CD-R & DVD-R Ver-3.2, 3.4, & 6.1
E-Mould Injection Moulding (Germany)
Poly-Carbonate Dryer Piovan.
Injection Moulding Process Parameter.

Knowledge Of Machine
Moulding Machine :-
Haitial, Jet-Master, Super-Master, L & T, Toshiba, Sumitomo, Cincinati Miacron, Mafatlal Niigata, Engal, Singulus E-Mould.

Industrial Trainings Attended
Organization: FEWA Electronics Corporation (Gagrate)
Role: (Trainee)
Duration: 3 months
Organization: Rockwell pipes in 2004.
Duration: 3 months

Project Handled
Last May 2011 Handling the New Project of PHIPLIPS INDIA LIMITED of “BRIGHTON” Tube light.
All New Mould Trial & Works with Quality & R & D Department.
Make Process Parameter and Required Document.
Last Dec 2011 Handling the New Project of PHIPLIPS APPLIANCE LIMITED Launch New “GC 1900 SERIES” Iron Model

Attainments
Best attendance award.
Achieved the highest rank in moulding minimum downtime.
Successfully maintained machine cycle time and increase efficiency.

Future Goals

Achive Target According To Planning

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com