Ref. No. : CA - 16501 - (Production - Moulding – with 11.4 years in Plastic Industry)

Education

Pursuing B Tech From KSOU (Mysore)- In 6th Sem
To complete in 2014-2017

Diploma in Plastic Technology from “Central Institute Of Plastics Engineering And Technology” Aurangabad (Maharashtra) Certified From I.S.O. 9001:2000 & also Approved by A.I.C.T.E. with 70.50%

Diploma In Plastics Technology from Cipet (Aurangabad) in 2010-2013 With 70.50%

HSC from Pune in 2010 with 44.17%

SSC from Pune in 2008 with 58.00%


Skill Sets

Basic  knowledge  of  computer  (MS-CIT).

Work Experience

Production Engineer
June 2014 till Date
Company Profile: Efficient Engineering Vender Of Hindustan Unilever


Trainee Engineer
July 2013 to July 2014 
Company Profile: An ISO 14001:2004, ISO 9001 - 2008, TS 16949 ISO 50001 certified Company with Injection molding process. This company is manufacturer of Automotive component for Ford, Volkswagen, Mahindra and Nissan
Job Profile:
Responsible for production and process activities vie planning as Priority and load,and target achievement and to increase productivity.
In process defect recording,analysis and trouble shooting.
Co-ordinate with Maintenance & Q.C.Department.
Target planning & creating quality awareness.
Responsible for trial of new moulds.
Man power planning in shifts.  
Organizing training programmer for operators.
Ensuring discipline,safety & Accident free machinery.
Implementing of 5’S on shop floor.

Reduce online rejection & control to lumps:
Maintain shift reports and Iso & Ts 16949 documents like Product start-up check sheet, 1s/2s Procedure check sheet.
Kaizen implementation in the Mould shop like shop floor layout for line balancing, better utilization of space,process flow,mistake proofing process.

Machine Handled
Ferromatic - 40 T – 275 T., L&T – 80 T., Jsw-240 , Engle, hi Tech-1250t Haw chin 80 t, micro injection molding machine baby Past 10 t
Knowledge of all types of injection molding machine handling

Raw Material Handled
Abs, pc, pmma, pp, nylon, lldp, lldp, san, celcone, pu

Mold Used:
Two Plates,Three Plates,Core system and Fully Hot Runner Mold.

Robot Handel:
Uttiman, star  Use Of 4 axises Robo

Technical Knowledge
A Diploma in Plastics Technology With a background of Plastics Injection Molding with experience in the field of Production department.
As a production Engineer.
Presently associated with Efficient Engineering 

Future Goals

To strive for gaining the knowledge & skills applying them to best of my ability to achieve organizational goals and to climb the ladder of success with hard work and sincerity.



Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com