BA in Industrial Engineering From Hashmite University in 2004 to 2008 With 2.71.
Tawjihie at al Zarqa Thanawiah school, in 2003 to 2004 With 86.4%
Attended training courses in ERP systems (enterprise resource planning systems) Microsoft dynamics AX ERP system 2009 (WHMS1, Production1, Production2, and Master Planning modules) implement these systems in a manufacturing company.
Build a Demand planning system using statistical forecasting models with Eviews software and Spss for survey analyses.
Good knowledge and analyses of electromechanical systems; mechanical failure, electrical failure & (PLC automated production lines failure root cause analyses ).
Establish and maintain a computerized maintenance management system (CMMS) for tracking work orders, spare parts, and maintenance history of plant equipment.
Ability to build MRP (material requirement planning system), MPS(Master production system), CRP systems( capacity requirement planning), BOM ( bill of materials), & production budget .
Team leader for building a balance scorecard system .
Specialized Software's
Eviews, Minitab, neurosolution5, POM, CMMS, Spss.
Production Engineer
Since April 2012
Company Profile: Syringe Manufacturing Company
Job Profile:
Reporting directly to the General Plant Manager.
Production Manager
Dec 2010 to April 2012
Company Profile: Medical Containers manufacturing Company
Planning Engineer
Jan 2009 to July 2010
Company Name: QUDS Paints
Job Profile:
Implement Many Systems
Two month training in orient plastic as a production engineer.
Job Profile:
Responsible for conducting trial runs of new molds and production equipment under development by Injection Molding
Responsible for generating Injection Molding processes, which meet target and result in acceptable part quality Responsible for following established ways and means in plant Cullman for organizing trial runs in coordination with all involved plant departments: Scheduling, Shift Supervisors, Material Handling, T&D, Maintenance, Logistics
Responsible for interacting closely with maintenance, T&D and floor personnel to minimize delays and ensure that trial runs are effective and the results useful. Responsible for issuing precise trial reports incl., but not limited to: Set up sheets, trail report, trial costs, gauging reports Support Injection Molding engineers to ensure speedy development of new projects
Support action plans and directives as determined by Injection Molding engineering
Reporting of critical tool, machine and equipment data to Injection Molding engineering and relevant plant departments.
An industrial engineer graduate who is looking for job; An excellent communicator, able to work on own initiative or as a part of a team, open minded and can work under pressure.
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com