Ref. No. : CA - 7518 - (Production Planning - Plastic Products and Processing – with 27.9 years in Plastic Industry)

Education

Diploma In Electrical Engineering With 67.00% From Govt. Ploytechnic, Khandwa, M.P. In The Year 1996

Skill Sets

Injection moulding production and maintenance

Work Experience

Production Engineer
Since May 2009
Company Profile: Laeding Manufacturer of Pipes, fittings, irrigation systems, plastic sheets, etc
JOB PROFILE:
Supervise IMM Programming and Setting.
Handle Shift independently and achieve production target.
Training & awareness to Machine Operator regarding Safety & production achievement
Analyses process failure causes
Production planning and controlling of Customer orders on priorities.
Raw material planning, Process Optimization.
Timely execution of customer orders without any delay in production planning.
Produced all material with minimum wastages and rejection
Up keep and maintenance of all machinery and Auxiliaries in production department with the help of maintenance department.
Increase productivity in all machines by proper planning and better output without effecting the quality of the products
Effective utilization of all available man power with a view to reduce unwanted resources.

Senior Production Engineer
From May 2005 To April 2009
Supreme Industries Ltd. (Injection Moulding div.), An ISO 9001-2000 manufacturing of P.V.C. pipe & Fitting.
Job Profile:
Supervise IMM Programming and Setting.
To prepare production plan as well as daily plan for preventive maintenance as per the planning schedule
Handle Shift independently and achieve production target.
Preventive & breakdown maintenance of plan & machinery
Training & awareness to Machine Operator regarding Safety & production achievement
Raw material management in the shop floor for day to day production
Analyses recess failure causes
Handle of all process problem.

Electrical Service Engineer
From 2003 to 2005
A Class Electrical Contractor
PLC Control Injection Moulding machines Haitian (china), Windsor, LG, super Master, N.N
Hydraulic System of Haitian machine.

Electrical Engineer
Form Aug. 1998 To Feb 2003.
Ambey Process, Burhanpur (Cotton Industry)
Job Profile:
Preventive & Breakdown maintenance of Induction motor, D.C. Motor & Control panel.
Improvement of Power Factor.
Accomplishment:
Reduce M.D.by improvement Power Factor
Exposure:
Stenter machine, Calendar Machine, Backfilling Machine, Power Loom.
Steam Boiler, Generator.
Maharashtra Sate Electricity Board
Maintenance of Distribution transformer HT & LT Lines, Oil Filtration & Other electrical Accessories.

Apprentice Engineer
From March 1997 to 1998
Maharsashtra State Electricity Board


Future Goals

To work in environment, which Challengers me enough to enhance my knowledge & skills & deliver results in my organisation & in the process to grow professionally & personally.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com