Ref. No. : CA - 12379 - (Production - Moulding – with 14.7 years in Plastic Industry)

Education

Three Year Diploma In Plastic Engineering And Technology From Govt. Polytechnic, Hoshiarpur, Punjab. (2007-2010)
Matriculation from P.S.E.B. in year 2007.

Skill Sets

COMPUTER SKILL:-
Good knowledge of computer Excel, Microsoft word, Power point, window Xp, window 7, window vista and Auto-cad.

Work Experience

Production Engineer
Since June 2010
Company Profile: Manufacturing a wide range of Cable Ties, coupler of mixer grinder, Philips components.
Job Profile:-
Process Planning & Inspection.
Setting of process parameters.
Handling man power
Updating all the document related to production Deptt.
Coordinating with Quality & Printing Liners with RDSO Officials
To help in Maintenance work

Production Machneries:
GEK Injection Molding from range 100 ton to 400 ton
Toshiba (L&T) injection molding machines
Stretching machine
Handle printing machines

Auxiliary Machineries:
Dry – Air Dehumidifier
LTM Dehumidifier
LTM Morton Autoloader
Compressor
Air Dryer
Robot

Technical/Practical Knowledge:
Injection Molding.
Testing of Plastic materials and Products
Costing and industrial Management.
Handled Molds:- Three Plate Mold, Hot runner mold

Knowledge Of Various Laboratory Tests Sach As :-
Specific Gravity, Melting Point, Rockwell hardness, Water Adsorption, Compressive Test, Tensile Test, Ash Content Test, MFI (Melt Flow Index)

Future Goals

Interested in working with a reputed and well managed organization where my potential is utilized to the fullest, thereby leading to the organization as well as my career in the organization. I would work in a challenging with positive and systematic approach which would give me opportunity to put my limits & brings the positive result to me and my organization.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com