Ref. No. : CA - 8300 - (Production - Moulding – with 16.4 years in Plastic Industry)

Education

Post Graduate Diploma In Plastic Processing & Testing From CIPET (Central Institute Of Plastic Engineering & Technology) Ahmedabad
Graduation (B.Sc.) (CBZ) With 55% Iind Division From CSJM University Kanpur (UP.)
Higher Secondary Examination With Scince 56% In Second Division From U.P. Board Kanpur.
High School Exam From UP. Board Kanpur In Second Division.

Skill Sets

Processing Technique of Plastics (such as Injection Extrusion, Blow & Compression Molding etc).
Properties & Application of Plastic Materials.
Additive & Compounding of Plastic materials
Testing Technique of Plastics (such as Mechanical, Electrical, Thermal, Optical & Chemical properties etc).

Work Experience

Production Engineer
Since April 2010
Reporting to Production Manager
Company Profile: An ISO 9000 & TS 16949 certified company, (one of the leading Ancillary groups for Maruti Udyog Ltd, Tata Motors, GM, Ford, Honda Motor Ltd & Hindustan Motor), manufacturing Injection molded automotive interior and plastics components, steering Wheel, and its complete assembly for all the models
Job Responsibility:-
Production planning review & manpower arrangement
Hourly monitor of production to achieve target as per plan.
Looking total production of Injection Moulding M/C.
Trouble shooting while online production.
To do new mould trial & making mould trial report and m/c process std.
To give proper training of worker about trouble shooting, 5S, Safety, Quality
and other activities.
To make daily, monthly m/c loading & unloading plan.
To achieve production and making efficiency of m/c
To keep all mould in good working condition maintaining all defect in mould history card to prevent mould breakdown.
To do daily rejection analysis of molded component and make counter-measure.

Jr. Engineer (Production)
From Aug. 2008 - March. 2010
Company Profile: market leater in plastic moulded components for automotive industries
Job Designation:
Maintain 5S on shop Floor
Looking total production of Injection Moulding M/C
Manpower handling on shop floor.
Setting of M/C & preparation of process parameters Sheets.
Trouble shooting while online production.
To do new mould trial & making mould trial report and m/c process std.
To achieve production and making efficiency of m/c.
To do daily rejection analysis of molded component and action to reduce it
To check m/c parameter & quality of product.

MATERIAL HNDLING-:
Different type of material like HDPE, PP,ABS, CYCLOY, POM, NYLON PC. P.B.T.etc.

PROCESS / MACHINERY EXPOSUER-:
WINDSOR SP 180T.TO 450
FERROMATIC OMEGA 350. TO 550.
FERROMTIC SIGMA 150 TO 275
L/T – LARSEN & TOUBRA
ASWA 350 TO 550 TONS

ACHIEVEMENTS-:
Reduce mould change over time.
Reduce lumps, power saving.
Wastage of poly-bags.
Achieving O.E.E & production efficiency.
Reduce rejection.

TRAINING-:
5-S Training
ERP prod. Feeding
ERP prod. planning
Kaizen Training
Red bin Analysis Training

Future Goals

Production Manager

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com