Ref. No. : CA - 19420 - (Production - Moulding – with 10.5 years in Plastic Industry)

Education

DPT (Diploma in Plastic Technology) From CIPET Central Institute of Plastics Engineering and Technology, in 2014

S.S.C. Examination From Odisha Board in 2011

Skill Sets

AUTOCAD 2007

Work Experience

Production Engineer (Injection Moulding)
Since Jul 2015
Company Profile: Rubber Moulded parts, Rubber to Metal Bonded Parts, Hoses, Hose Assemblies, Fuel Tubes,
Job Profile:
Injection moulding process
Parameter setting
Trouble Shooting
Process validation Man power Planning
Robot setting
Red Bin Analysis.
Daily production calculation.
Maintaining 5S activity in Shop floor & Kaizen work.
Process standardization and parameter monitoring.
Taking trial on new moulds & materials
Carry out preventive maintenance on molds

Machine Operating Kinowldge 
Machine - (5T -650T, Engle , Battenfeld, Fanuc Serries (A & B), Toshiba and  J S W,  Electronica

Material Processing Knowldge 
PP, ABS, PVC, PC, NYLON 

Trainee Engineer (Injection Moulding)
July 2014 to July 2015
Company Profile: commercial moulding and metal stamping shop supplying critical high precision parts and assemblies

Training Undergone In SMIEL:
Training on 5S, Training on Self-development, Training on TPM (Total productive maintenance), Training on PPAP, Training on FMEA, Training on SPC

Future Goals

Seeking to work in a new organizational platform where I can integrate my technical skills, knowledge and experience in present experiment for the growth of future expectation of the organization and myself in a competitive and challenging environment.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com