Ref. No. : CA - 13581 - (Production - Moulding – with 13.8 years in Plastic Industry)

Education

PGD-PPT From Central Institute of Plastic Engineering & Technology CIPET, Bhubneswar with 77% (2010 to 2012)
B.SC. From DDU University Gorakhpur (U.P) with 49.72% in 2010
HSC From U.P. Board Allahabad, Uttar Pradesh with 51.81% in 2006
SSC From U.P. Board Allahabad, Uttar Pradesh with 60.33% in 2004

Skill Sets

Application Software :- Word, Excel and Power Point & Auto cad.
Internet:- Comfortable with Internet and E-mail.

Work Experience

Production Engineer
Since May 2013
Company Profile: Manufacturing PVC Agri pipes, SWR pipes, Plumbing pipes, Casing Screen and Ribbed pipes, UGD pipes (Brown Color), Column Pipes, CPVC Plumbing pipes (Hot and Cold Water) SDR 11 & 13.5 as per ASTMD 2846.
Practical Experience :-
Theysohn twin screw extruder (108) uPVC pipe (twin head die output 15 tons in one shif)
Theysohn twin screw extruder (86) c-PVC pipe (twin head die output 6.5 tons in one shift)
Theysohn twin screw extruder (118) uPVC pipe ( twin head die output 24 tons in one shift )
FIL manufacturing of c-PVC plumbing pipe SDR 11 & 13.5 as per ASTMD 2846.

Production Engineer
Feb. 2012 to May 2013
Company Profile: Manufacturing of Plastic injection moulding component, Automotive Parts, Assemblies, and moulds.
Equipment Handles:
Injection moulding Machine MK (650 T), MK (450T), MK(320T), MK(200T)
Injection moulding Machine HAITAIN (380T,120 T)
Injection moulding Machine Ferromatic (450 T)
Injection moulding Machine JSW (350 T)
Injection moulding Machine L & T (200 T)

Production Engineer
July 2011 to Feb. 2012
Kisan Moulding Ltd (Silvassa unit)
Job profile:
Production planning
Raw material planning
Documents complication
M/C parameter processing
Machine Job Setting & Star-Up As Per Planning
Achieve daily production target
Rejection analysis.
Problem Analysis & Trouble Shooting
By Controlling Wastage, Monitoring Energy Consumption.
Reducing the Machine Breakdown Time.
Conduct supplier audit as per plan
Manpower Planning & handling
Training the Manpower
5S maintain
Knowledge of Injection Moulding, Extrusion (uPVC & cPVC pipe), Blow Moulding, Compression Moulding.
Knowledge of plastic raw material PE, PP, HDPE, LDPE, NYLON, u-PVC, c-PVC, PET, FRP, PC, PBT, ABS, GPPS, etc.

Future Goals

To handle a challenging role in your fast growing organization.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com