Ref. No. : CA - 21944 - (Production - Moulding – with 13.3 years in Plastic Industry)

Education

Pursuing MBA in Operation Management

Post Graduate Diploma in Plastic Processing and Testing From CIPET in 2011 with 78.85%

B.Sc Chemistry From C.M.Sc. College Darbhanga (L.N.M.University) in 2009

Skill Sets

A dynamic & self-motivated professional having 4 years of experience in the field of production and parts Quality inspection of injection molding, Coordination between purchase and tool room

Office Automations : MS-Word Excel, Internet,

Work Experience

Production Engineer/Supervisor- Injection Moulding
Since Dec 2013
Company Profile: Manufacturer of Automotive plastic fasteners, hose clip, cable tie. 

Production Engineer -Injection Moulding
Aug 2011 to Dec 2013
Company Profile: An ISO/TS 16949 Company.
Manufacturing Automotive components like Automotive fasteners & Quick connector, Door Panel, Bumpers, Sill Valance, Grills, Spoiler, Cantrail, Body side moulding & Air Duct Supply to OEM’s like VW, Tata Motors; M & M, Skoda & GM etc
Job Profile:
Trouble shooting of all type of (hot & cold runner) mold and Process related problems.
Quality inspection of injection molded parts.
Process standardization and parameter monitoring.
Analysis, study and rectification of process problems.
Taking trial on new moulds & materials 
Planning for mold change & breakdown maintenance. 
Taking follow-ups from tool room regarding mold issues.
Robot handling
Man power handling 
Daily production details entry.
Maintain Documents on work table (check sheet, work instruction etc.)

Industrial Training.
6 months Training from Previous Company

Machines Handled:
50T to 3200 T Injection molding machines (Engel, Arburg, Krauss Maffai, Nigata)

Material Handled:
HDPE, LDPE, PP, Nylon, PC, PET, POM, ABS, HIPS, GPPS, TPE etc..
Training undergone in MATE:   
Training on 5S & Autonomous maintenance. 
Training on Self-development. 
Training on Corrective & Preventive Action. 
Training on A3 problem solving.
Training on Red Bin Analysis.
Training on 7 QC Tools.
Training on TS-16949
Training on TPM (Total productive maintenance)
Training on FMEA.
Training on SPC.
Training on 8D.

About Six Sigma projects: 
Reduction of START UP Rejection in front cabinets(Target under progress) 
Reductions in Mold change follow SMED over time from 75 min to 60 min and further 60 min to 25 min (Target achieved) 
Knowledge about SAP & EMPRO System

Exposer To:
Microprocessor controlled Injection molding M/Cs, Blow molding M/Cs, Injection blow molding M/Cs.
Robotics (Wittmann Robo).Hot runner Molds of Yudo, Mold-Master and Huskey.

Future Goals

Growth

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com