Ref. No. : CA - 24804 - (Quality - Resin, Compounds, Masterbatch – with 10.5 years in Plastic Industry)

Education

Bachelor of Technology in Plastic Technology From University Institute of Chemical Technology, North Maharashtra University, Jalgaon in 2015

Diploma in Plastic Engineering, From Government Polytechnic Nashik, An Autonomous Institute Of Government Of Maharashtra, in 2012 with 77.38%.

S.S.C. From Karmaveer Bhausaheb Hire Vidhyalaya, Nashik Divisional Board, under the Maharashtra Board in 2009 with 84.76%.

Skill Sets

Basic knowledge of SAP-MM Module.
MS CIT, Microsoft Office.
Windows 7, Windows 8, XP, Vista. Etc.

Work Experience

Graduate Engineer Trainee (WWO-RBS)
Since Jun 2015
Company Profile: Leader in Wind Energy Segment. 
Job Profile:
Execution & Monitoring of Rotor Blade Refurbishment:
Resin & Material Use: Epoxy Resin, Polyester Resin, Glass Fibre, PU Painting system.
Process Handling: Hand Lamination, Vacuum Bagging, Infusion Process (Vacuum Assisted Resin Transfer Moulding).
Quality Assurance according to Protocols & its documentation.
Quality Check Area: Acoustic Inspection, Internal Travelling Camera Inspection, Profile Checking, Weight Balancing.
Maintaining document as per ISO standard and SAP entry for Material consumption, Material movement, Physical stock and order creation
Leading the site team to fulfill the quality and safety (SHE Policy) and management objectives (Maharashtra, Gujarat, Rajasthan).
Sensing the nerves of aging of WEC and planning for repair accordingly.
Coordinating with QA, Materials, Manufacturing, And Service Departments For Internal Planning And Support.
Delivering technical presentations on planning, process modification and implementation to the team.
Sustain and participation of lean tool activities likes 5S, Kaizen, Autonomous Maintenance, Root Cause Analysis etc.

In-plant Trainee
June 2014 to November 2014
Company Profile : Manufacturer of plastics molded automotive components for Indian And Global Automotive Original Equipment Manufacturers.
Job Profile : 
Injection Moulding of commodity (PP) & engineering thermoplastic (PC, ABS) using Hot Runner Mould.
Troubleshooting in Injection moulding [Engel (2000 T & 2300 T), Mitsubishi (1300 T)& FSC (1900 T)] and Rejection Control.
Attend different mould trail.
In process Quality control and maintaining ISO documents.
Participation in activities like 5S, TPM, KAIZEN & Root Cause Analysis.
Supervising Dashboard Assembly Line and satisfying internal and external customers through continuous improvements.
Conducting Torque Audit to ensure steering column hardware locking.
Skill Matrix Analysis of manpower to know their capability, technical & analytical skill.

Rope Access Training
Successfully completed Rope Access Training for L1 Grade from Globle Remote.

Project Details
A thesis on “Moldshop Study & Operation” during six month industrial training at TATA Autocomp Systems Limited.
Successfully completed project “To study the Effect of Jute Fibre on Mechanical Properties of Unsaturated Polyester” during 3rd year of Diploma in Engineering.

Future Goals

To work in a challenging environment demanding all my skills and efforts to explore and adopt myself in different fields, and realize my potential and contribute to the development of organization with impressive performance.

Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com