Diploma (Tool & Die making) From NTTF,Tellichery with 69%
H.S.C From St.Stephen’s HS School, Keerampara
with 65%
Certification course done for ISO ISO 9001:2015 & ISO 14001:2015(EMS/QMS) Internal auditor
QPR Document, Trend Analysis, QR6S, CIP, Cross Functional Coordination
MS Office (Word, Excel, PowerPoint, Outlook)
Windows 7,8 & XP
Internet
AutoCAD
Quality Engineer
Since Aug 2014
Company Profile: Manufacturer of Automotive accessories. Products being produced are Nudge guard, Roof carrier, Roof rail, Bumper corner protector for Four-wheeler and also tier 1 supplier to Toyota Kirloskar Motor Ltd, MSIL, M&M, Ford, Renault-Nissan, Honda etc.
Job Profile:
New product development co ordination
NPD Quality approval & Implementing new systems in mass production
Setup approval for all machining process
Painted parts inspection - Toyota Etios cross roof rail
Sampling plan inspection for assembled part @ PDI
Dock audit for critical parts
Analysis of in-process rejected component
Knowledge in incoming & pre dispatch quality inspection
Developing quality standards for new products
Industrial Training:
Training undergone as a Trainee Engineer in en Products Pvt Ltd
Period: April TO August 2014
Manufacturer of Special Purpose Machine (SPM) design, SPM development, Product design, Automation, Pneumatic solutions, PLC, Embedded Electronics, Electronic controllers etc.
Customer Portfolio
Toyota Kirloskar Motors,
Maruti Suzuki India Limited,
Ford,
Nissan Motors India Pvt Ltd.
Mahindra & Mahindra,
Honda Cars India Ltd,
Profile & Strengths
Deft knowledge in CNC Machining operations, injection moulding, blow moulding environment.
Ensuring part quality by patrolling & line inspection.
Rejection data collection & monitoring in process daily rejections.
Maintaining the quality control documents, reports & work instruction.
Implementation of 5’S activities.
Co ordination with new developing part inspection.
Responsible for ensuring the Calibration Status of gauge & instruments.
Making Improvements in the Line through Kaizen.
Rejection minimizing in the Process Improvement by using 7QC tools.
Developing Poka – Yoke to reduce rework and rejection level.
Responsible for ensuring the Calibration Status of gauge & instruments.
Design Packing method and material.
Work in a challenging environment that would facilitate the maximum utilization and application of my knowledge to meet the organizational goals
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com