B.Tech in Mechanical engineering U.P.T.U., Lucknow in 2013 with 70.20%
H.S.C From IHS Varanasi in 2009
S.S.C From DAV Pushawali in 2007
Quality engineer in quality department .
Technical Skills:
5S Activity
FPA,PFC,Packaging standard,QCFC,Control plan,Engineering changes notes ,material test certificate,layout inspection report,process flow chart,mark up drawing etc
7 QC tools
Knowledge to study technical drawing thoroughly.
Computer Skills:
Operating Systems : Windows 98/2000/XP/7.
Software : Microsoft excel, Power point, MS- Word.
Quality Engineer
Since May 2014
Company Profile: With a tool room and molding facilities, With a capacity of injection moulding machines from 90- 1000 ton, and 15 CNC milling machines. Core Competency include Design & Development of Mould, and Manufacturing of Plastic Components Automotive, refrigerator parts, washing machine polymer parts.
Supplier of LG Electronics India Ltd, Samsung, Aisin, Delphi, Lumax, Panasonic, Hella, Aquamall
Job Profile:
Active participation in customer complaints & warranty rejection analysis and problem solving
Involvement in making of PPAP new development and ECN.
Daily and monthly rejection analysis
Layout Inspection of newly developed part or product
Involve in making JIR report.
Process sheet and work instruction for existing and new development.
Involve in 5s activities.
Man power planning and control.
Involve in making time check report,first five inspection report,daily rejection report.
LG supplier Quality Training .
Assembly line handling and making all necessary document.
To Provide the Better Quality to customer
To fill up the counter measure and taking action against the problem .
Maintain Daily morning meeting data-LRN,LRR
Knowledge of Quality Tools .
Customer problem handling .
Internal Audits handling
Taking measurement through the help of engineering drawing.
Development Engineer
For 2 Years
Company Profile: Leading manufacturer of plastics containers and caps and closures
Project Title: Electromagnetic clutch.
Technologies used: Magnetic field creating it by winding motors.
Team Size: 4
Role Team leader
Project Description: The aim of this project is to to eliminate the declutching in vehicle. At the time of gear shifting clutch engage and disengage automatically depend on rpm.
Training:
Diesel Locomotive Works Varanashi
6 weeks
The main objective of this training was to get practical knowledge in manufacturing of locomotive diesel engine parts from initial to final parts and different process involve to make it.
Seeking a challenging position that leverages my experience and expertise in technical field, and my ability to transform operations through leadership and strategic planning. Where in my production, administration, problem solving, analytical skills and technical abilities shall be useful
Copyright © 2003 - 2015 Smartech Global Solutions Ltd. All rights reserved. Designed by Plastemart.com